Award Notice
Renovation of High Reservoir #2
Dept of Defense · Dept of the Army · Sol. W564KV26CA091
No deadlineClosed
This contract has been awarded
Awarded to Gebrüder Theissinger GMBH for $1.2M on Sep 28, 2026.
Recent Army contract awards: who won →
These similar contracts are still open:
- Upgrade Water Tanks - FCI Texarkana, TxThe Federal Bureau of Prisons wants a contractor to rebuild the water storage and distribution system at the Federal Correctional Institution in Texarkana, Texas.
- Construction of the new Regional Storm Water Retention Basin at Detroit Arsenal, Warren, MIThe U.S. Army Corps of Engineers (Louisville District) is running a market survey (Sources Sought) to find out which firms could build a new regional storm water retention basin…
- Nemo Domestic Well Northern Hills Ranger District, Black Hills NF, South DakotaThe USDA Forest Service wants a contractor to drill and develop a new domestic water well (about 170 feet deep) and build a roughly 280-foot water line near Nemo, South Dakota…
- Bill Parkin (MAK)The Indian Health Service (IHS) wants quotes from small businesses to install a septic system (septic tank, pump tank and sand mound drainfield) and a water service connection at…
- 9-Mile Pump StationThe U.S. Army Corps of Engineers Detroit District, with Macomb County Public Works, wants a contractor to build a new 9-Mile Pump Station in St.
AI summary Beta
No AI summary for this notice yet.
Save it to generate your own AI brief in its bid workspace: a plain-English summary, the red flags, and how well your business fits.
Key facts
- Posted
- Sep 28, 2026
- Notice type
- Award Notice
- Solicitation
- W564KV26CA091
- Agency
- Dept of Defense · Dept of the Army
- Office
- 0409 Aq HQ Contract
- Set-aside
- No Set aside used
- NAICS
- 237110
- Product/service code
- Z1PZ
- Business type
- Energy, fuel & utilities
- Place of performance
- Baumholder, DE-RP
- Contracting contact
- Rebekah Stonerabekah.e.stone.civ@army.mil
Before you respond
Full notice text from SAM.gov
The project provides the recoating of all surfaces, the renewing of the extraction and drainpipes, the renewing of the stainless-steel access stairs of both chambers and the lighting of the drinking water high reservoir Nr.2.