Award Notice
Consulting Flood Hydrologist Services for the U.S. Federal Energy Regulatory Commission
Department of Energy · Federal Energy Regulatory Commission · Sol. 89603026Q0062
No deadlineClosed
This contract has been awarded
Awarded to Hazen and Sawyer, D.P.C. for $1M on Sep 29, 2026.
Recent NAICS 541330 contract awards: who won →
These similar contracts are still open:
- SOURCES SOUGHT Data at Rest (DaR) - 400 Obsolescence ResolutionThe Air Force (AFLCMC/WIW) is doing market research for installing and integrating a replacement for the E-3G AWACS DAR-400 data-at-rest unit, using a Government-owned KG-204…
- Electronic Dental Annual Help Desk SupportThe Indian Health Service (Wagner Health Center, South Dakota) is doing market research for one year of annual help desk support, maintenance and software updates for its Dentrix…
- Sources Sought for Structural Engineer Expert ConsultantThe Army Corps of Engineers Philadelphia District is looking for a structural engineering expert to help the government defend a contractor claim before the Armed Services Board…
- RFP N62742-26-R-3601 Enterprise Construction Management Support Multiple Award Contract (ECMS MAC)NAVFAC Pacific plans to award multiple IDIQ contracts for construction management support (ECMS MAC) across the Navy's NAVFAC enterprise, covering the Atlantic and Pacific…
- GEOTECHNICAL DRILLING AND SAMPLING, IN-SITU TESTING, AND GEOPHYSICAL INVESTIGATION AT VARIOUS LOCATIONS, REPUBLIC OF KOREA (ROK)The U.S. Army Corps of Engineers Far East District wants a contractor for geotechnical drilling, sampling, in-situ testing and geophysical investigation at military bases in the…
AI summary Beta
No AI summary for this notice yet.
Save it to generate your own AI brief in its bid workspace: a plain-English summary, the red flags, and how well your business fits.
Key facts
Before you respond
Full notice text from SAM.gov
The agency seeks flood hydrologist consulting services for the purpose of performing in-depth reviewing/performing: • Watershed hydrologic modeling and associated uncertainties; • Probabilistic methods in estimating hydrologic hazard curves, including stochastic event flood modeling methods; • Site Specific, Statewide/Regional and Hydrometeorological Reports (HMRs) based Probable Maximum Precipitation (PMP) and Probable Maximum Flood (PMF) analyses; • Regional frequency analysis to derive Annual Exceedance Probability (AEP) of the precipitation and flood; • Climate change impact analyses on extreme precipitation using Shared Socioeconomic Pathways (SSP) data and/or NASA Earth Exchange Global Daily Downscaled Projections; and • Other flood hydrology-related analyses for dam safety. Typical work efforts associated with the effort include but are not limited to: • Review of submitted analyses, including digital files, prepared by Licensees or their consultants. • Review of published data or reports from federal, state and local sources. • Attendance at Board of Consultants meetings and project meetings. • Provide expert advice to FERC staff on complex flood hydrology issues. • Review proposed scopes of work developed by Licensees or their consultants for consistency with the FERC guidelines and state-of-the-practice procedures. • Preparation of written reports as directed, with critiques, conclusions and recommendations. • Review and comment on correspondence or other communications to Licensees prepared by FERC staff. • Develop technical whitepapers to assist dam safety staff in reviewing/resolving complex technical topics • Provide technical topic training to FERC staff