Solicitation
Construct North Unit Visitor Center at BADL
Department of the Interior · National Park Service · Sol. 140PS126B0010
AI summary Beta
Some details weren't available to this summary, so it may miss requirements. Check the attachments on SAM.gov.
The National Park Service wants a contractor to build a new one-story, 16,700 square foot North Unit (Cedar Pass) Visitor Center at Badlands National Park near Interior, South Dakota. It is a sealed-bid (IFB) firm-fixed-price construction job estimated at $10M to $20M, with three small options (two shade structures and a monument sign). The solicitation text says 730 days to build, but the specifications say 640 days.
Watch out for
- Set-aside conflict. The SAM.gov summary says no set-aside, but the solicitation says 100 percent small business, so a large business would be rejected and a small business should confirm with the contracting officer.
This construction requirement is set aside for 100% Small Business under NAICS 236220
- Large bid bond. A bid bond of 20 percent of the price (up to $3M) must be in the bid, and a bid with an unclear seal or Power of Attorney seal is rejected as non-responsive, so you need strong surety support.
(c) The amount of the bid guarantee shall be 20 percent of the bid price.
- Time zone confusion on the due time. The important dates say bids due 11:59 AM Central with opening at 12:00 PM Central, but the bid opening section says 12:00 PM Eastern (one hour earlier), so submit well before 11:00 AM Central.
Bid Opening Date/Time: Thursday, 10/15/2026 @ 12:00PM ET
- Email-only submission with required confirmation. A bid you cannot prove was received on time can be rejected, and one paragraph lists the contracting officer's email as ios.gov instead of ios.doi.gov, so double-check the address.
4. It is mandatory that you confirm the government has received your bid. If you do not receive a
- Performance time conflict. The solicitation form says 730 days but the specifications say 640 days, and the shorter number affects your schedule and liquidated-damages risk.
E. Period of performance: Work shall be completed within 640 calendar days of the start date
- Swelling clay soils. The 2023 geotechnical report calls the claystone moderately to highly expansive and recommends drilled piers and 4 feet of imported fill under slabs, which adds cost and weather-sensitive earthwork.
Therefore, we recommend the structure be founded on a reinforced concrete drilled pier
- Limitations on subcontracting. Your own forces must do at least 15 percent of the work (excluding materials), and you must submit a compliance worksheet with the bid.
Bidder must submit a completed Limitations in Subcontracting Report worksheet with the bid, outlining
- Archaeological and park restrictions. Ground disturbance may be monitored by a government archaeologist, finds can halt work, and disturbance limits and public-use rules apply inside a national park.
may have oversite by an Owner provided Archeologist. Coordinate schedules as required.
- Site visit and questions already past. The virtual site visit (9/10) and the question deadline (9/17) are over, and no formal on-site visit will occur, so rely on the slides, geotechnical report and your own visit to public areas.
A FORMAL ON-SITE VISIT WILL NOT TAKE PLACE FOR
Read from the notice and 7 attachments. 3 not read in full.
- Sol_140PS126B0010_Amd_0001.pdf
- Sol_140PS126B0010.pdf
- Attachment_1_-_Specifications_-_1262.pdf
- Attachment_4_-_Subcontracting_Worksheet.docx
- Attachment_7_-_Geotechnical_Report_-_Cedar_Pass_Visitor_Center_0001.pdf
- Attachment_8_-_Photo_Slides_0001.pdf
- Attachment_3_-_DBA_WD_SD20260022_5_18_2026.pdf
- Attachment_6_-_Virtual_Site_Visit_Sign-In_Sheet_0001.xlsx: spreadsheet: not read yet
- Attachment_5_-_Q_A_Document.xlsx: spreadsheet: not read yet
- Attachment_2_-_Drawings_-_134.pdf: too large
Full brief
What they want
- Build a one-story, 16,700 sq ft visitor center with a tall entry atrium, exhibit spaces, gift shop, administrative offices, educational spaces and public restrooms
- Site work and utilities, including parking and circulation
- Option 1: East Shade Structure
- Option 2: West Shade Structure
- Option 3: Concrete monument sign at the East Entry Drive
- Full building trades per the specifications: concrete, steel, doors and windows, finishes, fire sprinklers, plumbing, HVAC, electrical, communications, security and fire alarm systems
- Work in a national park: protect cultural and archaeological resources, utilities and landscape, and follow park rules
- Contract type
- Firm-fixed-price construction contract, sealed bid (Invitation for Bid), lump-sum pricing
- Period of performance
- Solicitation says 730 days after Notice to Proceed (11/02/2026 to 11/01/2028). The specifications say 640 calendar days from the Notice to Proceed start date. Anticipated award 11/2/2026.
- Place of performance
- Badlands National Park, 25216 SD-240, Interior, SD 57750 (Jackson County, South Dakota)
- Estimated value
- Estimated magnitude of construction $10M to $20M
- How they'll choose
- Sealed bidding: award to the responsible bidder with the lowest price whose bid conforms to the solicitation. The base price and all option prices are added together for evaluation.
- Offers due
- October 15, 2026. Bids due 11:59 AM Central Time with public virtual bid opening at 12:00 PM Central per the important dates list, but the bid opening instructions say 12:00 PM Eastern (the SAM.gov notice lists 12:00 PM Eastern).
- How to submit
- Email a single PDF to the Contracting Officer (Cole_Johnson@ios.doi.gov) and the Bid Recorder (Stephen_Loftus@ios.doi.gov). Fax, mail and any other method are not accepted. You must get an emailed confirmation of receipt.
- Page limits
- No page limit stated. 8.5 x 11 inch pages (foldouts up to 11 x 17); each email with attachments must be under 25MB, split across several emails if needed.
What they'll judge offers on
- Lowest total price (base plus all options)
- Bid conforms to the solicitation
- Bidder is determined to be responsible
What to include when you submit
- Name the file 'BID PACKAGE' (PDF format), one electronic copy, no hard copies
- Email subject line: Bid Submission for 140PS126B0010 - Construct North Unit Visitor Center - email 1 of X
- Complete SF 1442 blocks 14 through 20c, with your SAM UEI in block 14 and the lump-sum total in block 17
- Fill in the Section B bid schedule (base CLIN 0010 and option CLINs 0020, 0030, 0040), rounded to the nearest dollar; the total must match block 17
- Include an SF 24 bid guarantee of at least 20 percent of the bid price (not more than $3M), signed and stamped, with a visible seal and visible Power of Attorney seal
- Include the completed Limitations on Subcontracting worksheet (Attachment 4 or your own format)
- Acknowledge Amendment 0001 (and any later ones) in block 19 or with a signed statement
- Original signatures of authorized individuals (electronic copies of originals are acceptable)
- Password protecting the bid is recommended; send the password to both email addresses
- No alternate bids or alternate pricing
- Questions were due 9/17/2026 on the Q&A document
You must have
- Total small business set-aside under NAICS 236220 (size standard $45 million average annual receipts). Note the SAM.gov summary says no set-aside, so confirm.
This construction requirement is set aside for 100% Small Business under NAICS 236220
- Bid guarantee of 20 percent of the bid price (capped at $3M) submitted with the bid.
(c) The amount of the bid guarantee shall be 20 percent of the bid price.
- Performance and payment bonds for the awarded contract (the clause is listed in the solicitation; confirm amounts in the full text).
52.228-15 Performance and Payment Bonds- Construction (Jun 2020)
- Active SAM.gov registration with a UEI at bid close, at award and throughout performance; must be small under the NAICS size standard.
- Comply with the limitation on subcontracting: the prime (or similarly situated entities) must perform at least 15 percent of the work, excluding materials.
Bidder must submit a completed Limitations in Subcontracting Report worksheet with the bid, outlining
- Be a construction contractor with a place of business (or have arranged personnel, equipment and licenses); may be asked for experience and financial resources before award.
- Firms that helped design or write the specifications for this project cannot bid or be part of a bidding team.
In accordance with FAR 36.201-1, all firms, prime contractors or subconsultants, involved in developing the
- Pay Davis-Bacon prevailing wages for Jackson County (wage determination SD20260022).
LABOR REQUIREMENTS: Davis Bacon Wage Determination(s) for Jackson County, apply.
Not in the notice text
- Drawings (Attachment 2) were too large to read, so the full scope is not visible
- Q&A document (Attachment 5) and virtual site visit sign-in sheet (Attachment 6) were not read; answers there may change requirements
- About 68,000 characters in the middle of the solicitation and about 967,000 characters of the specifications were left out, including most clauses, Section H special requirements and technical sections
- Whether performance and payment bonds are required and for what amount (the SF 1442 box was not readable)
- Liquidated damages rate and any other delay penalties
- Whether the options will be exercised at award or later (the government says it may award some, none or all)
- Exact bid due time zone (Central versus Eastern)
FedReady checks notices like this against your business profile, tracks deadlines, and alerts you to new matches. Creating an account is free.
Key facts
- Response due
- Oct 15, 2026, 4:00 PM UTC
- Posted
- Sep 10, 2026
- Notice type
- Solicitation
- Solicitation
- 140PS126B0010
- Agency
- Department of the Interior · National Park Service
- Office
- Doi, NPS Conops Strategic
- NAICS
- 236220
- Product/service code
- Y1AZ
- Business type
- Construction & renovation
- Contracting contact
- Johnson, Colecole_johnson@ios.doi.gov2673210342
Full notice text from SAM.gov
Similar open opportunities
- Barillas Peak & Encino Vista Lookout Tower Restoration, Santa Fe NFThe U.S. Forest Service (Southwest) wants quotes to design and replace the cab (the room at the top) of the Barillas Lookout Tower on the Santa Fe National Forest in New Mexico,…
- Trade and Cargo AcademyThe Army Corps of Engineers Charleston District wants a contractor to build a Trade and Cargo Academy and a Cargo Security and Seized Property Training Facility at the Federal…
- FCKY UEPH Barracks CM@RiskThe Army Corps of Engineers (Louisville District) is doing market research for construction of Unaccompanied Enlisted Personnel Housing (barracks) at Fort Campbell, KY, using a…
- Lease Fit-Out Construction in Nuuk, Greenland - Sources Sought/Market ResearchThe U.S. Department of State (Bureau of Overseas Buildings Operations) is doing market research for a construction contract to fit out three floors of a leased, occupied building…
- Fort Lee Vehicle Recovery RangeThe Army Corps of Engineers (Norfolk District) wants a contractor to build 24 concrete turning pads with site drainage and road alignment and repair at Fort Lee, Virginia.