Solicitation
657-27-107JC, Replace Select Hot Water Heating System
Department of Veterans Affairs · Sol. 36c25526r0166_1
AI summary Beta
Some details weren't available to this summary, so it may miss requirements. Check the attachments on SAM.gov.
VA Network Contracting Office 15 wants a contractor to replace four 45-gallon hot water generators (water heaters) in a basement room at the John Cochran Division of the St. Louis VA Medical Center in Missouri, keeping hot water running during the swap, and then provide one year of guarantee-period service. It is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside with a stated construction magnitude of $500,000 to $1,000,000. Proposals are due by email on 16 Oct 2026 at 2:00 PM CT, with an original bid bond mailed to the contracting office.
Watch out for
- Notice and solicitation disagree on competition type. SAM.gov lists the set-aside as SDVOSB Sole Source, but the solicitation says it is an SDVOSB set-aside with proposals evaluated competitively, so confirm with the contracting officer before spending time.
This project is being solicited as a Service Disabled Veteran Owned Small Business (SDVOSB) set-aside.
- Evaluation method is stated two ways. Pages 1 and 9 say best value tradeoff, while the proposal instructions say lowest price technically acceptable with pass/fail factors, which changes how much to spend on the technical write-up versus price.
FOR LOWEST PRICE TECHNICALLY ACCEPTABLE COMPETITION
- Original bid bond must be mailed. Even though the proposal is emailed, the original bid bond must reach Leavenworth, KS before closing, and a missing bond can get the offer rejected.
ORIGINAL BID BONDS MUST BE RECEIVED AT THE CONTRACTING OFFICE PRIOR TO THE SOLICITATION CLOSING AT:
- High past performance bar for a small job. You need a prior prime contract replacing hot water heating systems at a hospital or medical facility worth $1,000,000 or more, though this job is estimated at $500K to $1M.
A. Replacement of Hot water Heating Systems at a hospital or medical facility, as a prime
- Performance period conflicts (240 vs 120 days). CLIN 0001 says 240 days while the performance period section and SF 1442 say 120 calendar days, which affects scheduling and pricing.
Period of Performance 240 days.
- Subcontracting certification form appears marked for services. The attached VAAR 852.219-75 form has the Services (50%) box marked, while this is a construction job where the general construction limit is 85%, so ask the contracting officer which box applies.
(i) X□ Services. In the case of a contract for services (except construction),
- Performance and payment bonds at 100%. After award you need bonds for the full contract price covering the guarantee period too, within 10 days of award.
Performance and Payment Bonds will be required in the amount of 100% of the contract
- Many required key personnel. You must name a project manager, QC manager, safety officer and site superintendent, each with 3 similar projects, and no person may fill more than two roles.
- Work in an active hospital with no loss of hot water. The new units must be running before the old ones come out, and the guarantee-period service must be done by the original installer for a full year.
The original installer of the equipment shall be required to provide the Guarantee Period
- Site visit and question deadlines already passed. The only site visit was 09/22/2026 and questions were due 09/25/26, so new bidders must rely on the documents.
There will be one site visit for this project.
- Wage determination number differs. The project information cites Davis-Bacon General Decision MO20260089 but the attached wage sheet is MO20260080, so check which applies for pricing.
Davis Bacon - General Decision Number: MO20260089 9/3/2026
Read from the notice and 5 attachments.
- SOLICITATION 36C25526R0166_1.pdf
- ATTACHMENT SPECIFICATIONS 36C25526R0166_1.pdf
- VAAR 852.219-75 LIMITATIONS ON SUBCONTRACTING.pdf
- ATTACHMENT DESIGN MANUAL 36C25526R0166_1.pdf
- ATTACHMENT DRAWINGS 36C25526R0166_1.pdf
Full brief
What they want
- Remove and replace four 45-gallon domestic hot water generators in the John Cochran Division sub-basement mechanical room (shown as room B018-01-JC in the SOW and B001-01-JC on the drawing)
- Plan and schedule the work so hot water service is not interrupted during the transition
- Connect the new units to existing piping, controls, electrical wiring and safety devices; pressure test and leak check
- Commission the new units: fill and purge, calibrate controls and safety devices, verify performance and document results
- Remove the four old generators and ancillary equipment, and dispose of or recycle them properly
- Deliver as-built drawings and O&M manuals, give a walkthrough and train facility staff, then close out the project
- CLIN 0002: one year of inspection and maintenance (guarantee period services) after acceptance, to be done by the original installer
- Contract type
- Fixed-price construction (payment clause is for fixed-price construction contracts); single award on CLIN 0001 plus CLIN 0002 guarantee period services; no liquidated damages
- Period of performance
- Documents disagree: SF 1442 and the performance period section say 120 calendar days for the base bid (start within 10 days of notice to proceed), but the CLIN 0001 text says 240 days. Plus a 1-year guarantee period after acceptance.
- Place of performance
- VA St. Louis Health Care System, John Cochran Division, 915 N. Grand Blvd, Saint Louis, MO 63106
- Estimated value
- Magnitude of construction stated as $500,000 to $1,000,000
- How they'll choose
- Documents conflict. The SF 1442 page, the notice and the basis-for-award line say best value tradeoff, but the proposal instructions are headed Lowest Price Technically Acceptable (LPTA), with five acceptability factors. Award is intended on initial offers without discussions.
- Offers due
- October 16, 2026, at 2PM CT (SAM.gov: 2026-10-16 14:00, UTC-05:00)
- How to submit
- Email to Gislaine.Dorvil@va.gov (Part 1 Technical Proposal and Part 2 Price Proposal as attachments); original bid bond mailed to NCO 15, Attn: Gislaine Dorvil, 3450 S. 4th Street Trafficway, Leavenworth, KS 66048, to arrive before closing. Physical copies of proposals are not accepted.
What they'll judge offers on
- Relevant past performance of the prime contractor (1 to 3 completed contracts replacing hot water heating systems at a hospital or medical facility, as prime, $1,000,000 or more, finished within the last 5 years)
- Technical construction experience of the prime contractor (1 to 3 projects, prime under NAICS 236220, $1,000,000 or more, offeror self-performed at least 15% of on-site labor, at an active hospital or medical facility)
- Technical qualifications of proposed key staff (project manager, QC manager, on-site safety officer, site superintendent)
- Technical construction experience of proposed manufacturer, suppliers, installer or related subcontractors
- Contractor safety plan
What to include when you submit
- Each email must be under 10 MB; if you use several, label them 1 of 3, 2 of 3 and so on
- Complete SF 1442 (blocks 10 and 14 through 20) and acknowledge every amendment, including Amendment 0001 which adds the VA Notice of Limitations on Subcontracting attachment
- Bid guarantee is required; a photocopy must be with the offer and the original must be received by the contracting office before closing
- Submit pricing for each CLIN, including the monthly and 12-month total for CLIN 0002 guarantee period services
- Sign and return the VAAR 852.219-75 Limitations on Subcontracting certification with the proposal
- Include the price breakdown and self-performed vs. subcontracted work calculation (Appendix 1) and the Pre-Award Contractor Safety and Environmental Record Evaluation form (Appendix 2), both listed in the table of contents
- Provide your Unique Entity Identifier; you must be registered in SAM and VetBiz by the proposal due date
- Resumes and project examples for key staff, 1 to 3 past performance contracts and 1 to 3 technical experience projects, with a point of contact for each
- Questions were due 09/25/26 at 2PM CST to Gislaine.Dorvil@va.gov
You must have
- SDVOSB set-aside; must be registered in SAM and VetBiz by the proposal due date (joint ventures too)
and joint ventures must be registered in SAM and VetBiz by the proposal due date in order to be eligible for award.
- Bid guarantee of at least 20% of the bid price (capped at $3,000,000), then performance and payment bonds for 100% of the contract price
A bid guarantee is required in an amount not less than 20 percent of the bid price but shall not
- Safety and environmental record: certify no more than 3 serious, 1 repeat or 1 willful OSHA violation, or any EPA violation, in the past 3 years (applies to subcontractor tiers too)
bidder/offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or
- Signed VAAR 852.219-75 limitations on subcontracting certification; offers without it are ineligible
Government will not consider offers for award from offerors that do not provide the
- VETS-4212 report filed for the preceding fiscal year
contractor who has not filed a VETS-4212 report for the preceding fiscal year under Title 38 Section 4212 (d).
- Qualified full-time site superintendent with OSHA 30 training on site at all times, plus project manager, QC manager and safety officer with stated experience
A designated and qualified site superintendent shall be present on the job site at all times. This
- Small business size standard for NAICS 236220 is $45M
The NAICS code for this project is 236220 ($45.0M)
Not in the notice text
- Full text of the solicitation: about 137,000 characters in the middle were not provided (rest of the proposal instructions, price proposal format, safety plan factor details, representations and clauses)
- Which evaluation method actually applies (tradeoff or LPTA) and how the five factors are rated
- Whether the period of performance is 120 or 240 days
- Project specification sections (the file labeled specifications is the VA water boiler design manual, with the middle omitted) and the full drawings (only a title sheet and one plan sheet were readable)
- Content of Appendix 1 (price breakdown / self-performed work calculation) and Appendix 2 (safety and environmental record form)
- Whether the contract is firm-fixed-price (not stated in plain words in the text provided)
- Contents of Amendment 0001 beyond the notice saying it adds the VA Notice of Limitations on Subcontracting attachment
- Exact room number (SOW says B018-01-JC, drawing says B001-01-JC)
FedReady checks notices like this against your business profile, tracks deadlines, and alerts you to new matches. Creating an account is free.
Key facts
- Response due
- Oct 16, 2026, 7:00 PM UTC
- Posted
- Sep 17, 2026
- Notice type
- Solicitation
- Solicitation
- 36c25526r0166_1
- Agency
- Department of Veterans Affairs
- Office
- 255-Network Contract Office 15 (36C255)
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Sole Source (FAR 19.14)
- NAICS
- 236220
- Product/service code
- Z2DA
- Business type
- Construction & renovation
- Place of performance
- Saint Louis, MO, 63103
- Contracting contact
- Gislaine DorvilGislaine.Dorvil@va.gov9139461139
- Versions
- 2 (amended since first posted)
Full notice text from SAM.gov
Similar open opportunities
- Barillas Peak & Encino Vista Lookout Tower Restoration, Santa Fe NFThe U.S. Forest Service (Southwest) wants quotes to design and replace the cab (the room at the top) of the Barillas Lookout Tower on the Santa Fe National Forest in New Mexico,…
- Trade and Cargo AcademyThe Army Corps of Engineers Charleston District wants a contractor to build a Trade and Cargo Academy and a Cargo Security and Seized Property Training Facility at the Federal…
- FCKY UEPH Barracks CM@RiskThe Army Corps of Engineers (Louisville District) is doing market research for construction of Unaccompanied Enlisted Personnel Housing (barracks) at Fort Campbell, KY, using a…
- Lease Fit-Out Construction in Nuuk, Greenland - Sources Sought/Market ResearchThe U.S. Department of State (Bureau of Overseas Buildings Operations) is doing market research for a construction contract to fit out three floors of a leased, occupied building…
- Fort Lee Vehicle Recovery RangeThe Army Corps of Engineers (Norfolk District) wants a contractor to build 24 concrete turning pads with site drainage and road alignment and repair at Fort Lee, Virginia.