Similar open opportunities

  • CON | Z1DA | REPLACE OR CHILLERS | 580-23-105 | PRESOLICITATIONDepartment of Veterans Affairs · Houston, TX · Due Oct 12, 2026The VA Medical Center in Houston, TX plans a construction contract to remove and replace two operating room chillers in Building 100.
  • CON | Z2DA | REPLACE CHILLER 1 B104 | 580-24-111 | PRESOLICITATIONDepartment of Veterans Affairs · Houston, TX · Due Oct 13, 2026The VA medical center in Houston, TX plans to replace a failed 1,000-ton chiller (plus transformer, piping, valves and controls) in Building 104.
  • Joint Base MDL - Kitchen Exhaust Hood MaintenanceDept of Defense · Dept of the Air Force · Joint Base MDL, NJ · Due Oct 13, 2026The 87th Contracting Squadron at Joint Base McGuire-Dix-Lakehurst, New Jersey, wants a contractor to maintain and certify commercial kitchen exhaust hoods, including plenum water…
  • Bldg. 100 Roof Top AHU-8 ReplacementDepartment of Veterans Affairs · Palo Alto · Due Oct 14, 2026The VA Palo Alto Health Care System (through Network Contracting Office 21) plans to replace a rooftop air handling unit (AHU-8) in Building 100 at the Palo Alto VA Medical…
  • Building 450 Fire Suppression System InstallationDept of Defense · Dept of the Air Force · Grissom Arb, IN · Due Oct 15, 2026The Air Force (a nonappropriated-fund entity at Grissom Air Reserve Base, Indiana) wants a design-build contractor to build a new heated, fire-rated 32' x 16' office inside…