Presolicitation
RM12-2050, Repair and Renovate UPH-BEQ Building 3606, JEB Little Creek-Fort Story, Virginia Beach, VA.
Dept of Defense · Dept of the Navy · Sol. N4008517R0309
No deadline
AI summary Beta
NAVFAC Mid-Atlantic plans to repair and renovate Bachelor Enlisted Quarters Building 3606 at JEB Little Creek-Fort Story, Virginia Beach, VA. The RFP was expected around 27 December 2016 and the work is unrestricted and competed openly. Estimated construction cost is $25 million to $100 million, with 572 calendar days to complete.
Watch out for
- Very large project. A $25 million to $100 million construction job likely requires large bonding capacity and experience, which is hard for a small business alone.
The estimated construction cost is between $25,000,000 and $100,000,000.
- Unrestricted competition. No small business set-aside, so you compete with large contractors.
the procurement will be solicited on an unrestricted basis with full and open competition
- Complex occupied-facility work and cybersecurity. Interconnected systems, security upgrades and cybersecurity commissioning add technical and coordination risk.
- Old notice. Posted in 2016, so the opportunity is likely closed.
Read from the notice text only.
Full brief
What they want
- Replace all major building systems in BEQ Building 3606 and support building 3606A, including HVAC, sanitary sewer piping, electrical panels, ventilation and ducts
- Reconfigure room layouts to a 2+0 concept with two separate baths
- Replace the fire alarm and detection system and elevators; add security cameras
- Install a complete fire sprinkler system and replace the roof in building 3606B
- Bring the facility up to antiterrorism/force protection standards (UFC 4-010-01), including progressive collapse
- Replace mechanical system in 3606B and separate the interconnected building systems
- Provide cybersecurity commissioning for DDC controls, fire alarm and security monitoring systems
- Power wash exterior walls with mold inhibitor paint; landscaping and site improvements
- Contract type
- Construction RFP (full and open competition)
- Period of performance
- 572 calendar days after award; anticipated award June 2017
- Place of performance
- JEB Little Creek-Fort Story, Virginia Beach, VA
- Estimated value
- Between $25,000,000 and $100,000,000
- How to submit
- RFP to be issued on NECO at https://www.neco.navy.mil/index.aspx; register on the site to get amendment emails
What to include when you submit
- Register with NECO to receive emails about amendments
- Specifications will be posted with the solicitation
You must have
- Unrestricted, full and open competition (not a small business set-aside)
the procurement will be solicited on an unrestricted basis with full and open competition
- NAICS 236220 with a small business size standard of $36.5 million (applies if you claim small business status)
The North American Industry Classification System (NAICS) Code for this project is 236220
Not in the notice text
- Evaluation method and factors
- Proposal due date
- Bonding and insurance requirements
- Specifications (to be posted with the solicitation)
- Contract type
Is this a fit for your business?
Create a free accountFedReady checks notices like this against your business profile, tracks deadlines, and alerts you to new matches. Creating an account is free.
Key facts
- Posted
- Dec 9, 2016
- Notice type
- Presolicitation
- Solicitation
- N4008517R0309
- Agency
- Dept of Defense · Dept of the Navy
- Office
- Navfacsyscom Mid-Atlantic
- NAICS
- 236220
- Product/service code
- Z
- Business type
- Construction & renovation
- Contracting contact
- Kate Dinneen 757-341-1031 Katherine.dinneen@navy.mil
Full notice text from SAM.gov
This is neither a request for quote or proposal nor an invitation for bid. The intent of this pre-solicitation synopsis is to inform potential offerors of this requirement. The Request for Proposal (RFP) will be issued by NAVFAC Mid-Atlantic Hampton Roads IPT on or about 27 December 2016. The solicitation number will be N40085-17-R-0309 on the Navy Electronic Commerce Online website (NECO) at https://www.neco.navy.mil/index.aspx. A Vendor User Guide is available for download at the site as well as the NECO Help Desk contact phone number for any issues/questions related to the website. Ensure that you register with the site so you will receive emails applicable to this solicitation in the event of any amendments and/or any changes regarding this solicitation and/or solicitation of interest. Primary POC: Kate Dinneen, Phone: (757) 341-1031, Email: katherine.dinneen@navy.mil A sources sought notice was posted on 8 November 2016 under synopsis N40085-17-R-0309 to determine availability and capability of small businesses to perform the requirement. Based on market research results, the procurement will be solicited on an unrestricted basis with full and open competition. NAVFAC Mid-Atlantic’s Office of Small Business Programs concurs with the determination to solicit as an unrestricted procurement. Project Description: This project will repair and upgrade Bachelor Enlisted Quarters (BEQ) Building 3606 by eliminating all Q4 Condition and/or Configuration ratings to bring these facilities up to a Q1 rating to comply with the Defense Planning Guidance. All major building systems are substandard and need replacement. Facility repairs will meet current code requirements and correct existing deficiencies. Room layouts will be reconfigured to provide two separate baths and service areas (2+0 concept) in lieu of one shared bath for two rooms; remove and replace two closets to fit the reconfigured space. This project will inspect, replace or repair the existing sanitary waste drain lines in the laundry room in building 3606A. All existing sanitary sewer piping in 3606 will be replaced. Electrical breaker panels will be replaced as required to handle the electrical load. The existing 3606 building ventilation system and ducts will be replaced. The facility will be brought up to all Antiterrorism /Force Protection (ATFP) standards in accordance with Unified Facilities Criteria (UFC) 4-010-01 including progressive collapse. The exterior walls of the buildings will be power washed and a mold growth inhibitor paint applied. All emergency lighting and exit signs will be replaced with energy efficient stainless steel fixtures with a protective metal cage placed around them to prevent vandalism. Additional video security cameras will be provided to for security coverage to all blind areas and the existing security monitoring system will be upgraded as required to handle the cameras. The existing trash dumpster enclosures will be replaced with higher side walls and lockable gates. The deteriorated elevators will be replaced and security cameras will be provided. The current fire alarm and detection system does not meet current standards and must be replaced to bring these buildings in compliance with current life safety codes and UFC-3-600-01. Properly sized natural gas potable hot water boilers will be provided in 3606B to supply the domestic hot water requirements of 3606 and 3606A. Landscaping site improvements will be incorporated in this project. The project replaces the existing 2-pipe heating and cooling system in buildings 3606 and 3606A and provides temporary heating and cooling for building 3609 until a project for building 3609 is programmed. The heating, ventilation, and air conditioning (HVAC) system and direct digital controls (DDC) used should be the most energy efficient system possible, but natural gas was used for planning and estimating purposes. Alternative types of energy efficient HVAC systems will be taken into consideration with the goal to meet the reduced energy consumption mandates. Building 3606 is a five-story, 91,000 SF BEQ built in 1989 and building 3606A is a 7,680 SF BEQ support building built in 1989. The scope of work includes replacing the mechanical system in building 3606B for buildings 3606 and 3606A. These buildings are constructed so that the mechanical systems are interconnected. This project will remove this interconnection so as to provide each building with an independent mechanical system. This will allow isolation of each in case of an outage or necessary repairs. The work also includes all incidental work to make the HVAC system functional. All facilities will include cybersecurity commissioning for infrastructure systems such as Direct Digital (DDC) controls, fire alarm and detection and security monitoring systems. This project will install a complete and useable fire sprinkler system and a roof replacement in building 3606B. The estimated construction cost is between $25,000,000 and $100,000,000. The anticipated award of this contract is June 2017. The completion time for this contract is 572 calendar days after award. The specifications for this project will be posted with the solicitation and are not available at this time. The North American Industry Classification System (NAICS) Code for this project is 236220, Commercial and Institutional Building Construction, with a small business size standard of $36.5 million.
Similar open opportunities
- Barillas Peak & Encino Vista Lookout Tower Restoration, Santa Fe NFThe U.S. Forest Service (Southwest) wants quotes to design and replace the cab (the room at the top) of the Barillas Lookout Tower on the Santa Fe National Forest in New Mexico,…
- Trade and Cargo AcademyThe Army Corps of Engineers Charleston District wants a contractor to build a Trade and Cargo Academy and a Cargo Security and Seized Property Training Facility at the Federal…
- FCKY UEPH Barracks CM@RiskThe Army Corps of Engineers (Louisville District) is doing market research for construction of Unaccompanied Enlisted Personnel Housing (barracks) at Fort Campbell, KY, using a…
- Lease Fit-Out Construction in Nuuk, Greenland - Sources Sought/Market ResearchThe U.S. Department of State (Bureau of Overseas Buildings Operations) is doing market research for a construction contract to fit out three floors of a leased, occupied building…
- Fort Lee Vehicle Recovery RangeThe Army Corps of Engineers (Norfolk District) wants a contractor to build 24 concrete turning pads with site drainage and road alignment and repair at Fort Lee, Virginia.