The Army Corps of Engineers (New England District) is seeking a construction contractor to replace the chilled water plant and upgrade site utilities at the VA Medical Center in West Haven, CT. Work includes demolishing the old plant, building a new multi-story plant and a new fuel tank farm, and new water, steam and electrical lines, all on an active hospital campus.
Watch out for
- Work on an active hospital campus. The medical center runs around the clock, so work must be tightly coordinated and disruptions kept to a minimum.
The work is located adjacent to and within an active Medical Center campus which will be operational at all times.
- Limited laydown and storage space. A constrained site makes material storage and staging harder and can raise costs.
the work area is constrained due to the active medical center operations which will limit laydown and storage areas during construction
- Large multi-discipline project. Civil, mechanical, electrical, plumbing, structural, geotechnical and architectural work, plus a new fuel tank farm, is a big job for a small contractor to price and manage.
This project involves civil/site, mechanical, electrical, plumbing, structural, geotechnical, and architectural disciplines.
Read from the notice text only.
Full brief
What they want
- Demolish the existing chilled water plant (building 16a) and build a new multi-story chilled water plant with chillers, cooling towers and pumps
- Build a new fuel tank farm that mainly serves the central boiler plant
- Replace the fire protection water main and domestic water main from Campbell Avenue to Building 15
- Install utility loops for chilled water, steam, condensate, domestic water and fire protection water
- Install a redundant electrical feeder to Building 19 and coordinate with the local utility
- Build new water storage tanks
- Design to VA physical security requirements and target LEED Silver for the plant
- Place of performance
- VA Medical Center, West Haven, CT
- Offers due
- 2026-10-23T13:00:00-04:00
You must have
- Must meet the VA Physical Security Resiliency Design Requirements
The project must also comply with the DVAs Physical Security Resiliency Design Requirements (PSRDM).
- Plant expected to meet USGBC LEED Silver certification
It is expected that the chilled water plant will be constructed to meet USGBC LEED Silver certification.
Not in the notice text
- Estimated price range or magnitude
- Contract length and completion schedule
- Evaluation method and factors
- Bonding, insurance and licensing requirements
- How to submit the proposal
- Whether a site visit is required
Is this a fit for your business?
Create a free accountFedReady checks notices like this against your business profile, tracks deadlines, and alerts you to new matches. Creating an account is free.
Key facts
- Response due
- Oct 23, 2026, 5:00 PM UTC
- Posted
- Sep 30, 2026
- Notice type
- Solicitation
- Solicitation
- W912WJ26RA008
- Agency
- Dept of Defense · Dept of the Army
- Office
- W2SD Endist New England
- NAICS
- 236220
- Product/service code
- Y1NB
- Business type
- Construction & renovation
- Contracting contact
- Tyler Maryaktyler.s.maryak@usace.army.mil9783188049
- Versions
- 5 (amended since first posted)
Full notice text from SAM.gov
The scope of the chilled water plant replacement consists of the demolition of the existing chilled water plant (building 16a) and construction of a new multi-story chilled water plant to include chillers, cooling towers, pumps, and all associated mechanical and electrical equipment. Due to the close proximity of the existing fuel tank farm adjacent to the existing chilled water plant, a new fuel tank farm will need to be constructed as part of the project, which primarily serves the central boiler plant, requiring close coordination with the medical center and ongoing related projects.The scope of the site utility upgrades consists of the replacement and upgrade of the existing fire protection water main and the domestic water main from Campbell Avenue to Building 15. Site utility upgrades also include providing utility main loops of chilled water supply and return, steam supply, condensate return, domestic water supply, and fire protection water supply which will originate from the new chilled water plant and back-feed to Building 1. The work also includes the installation of redundant electrical feeder from the utility demarcation point to Building 19 and coordination with the local electrical utility provider to provide further electrical redundancy offsite as well. In addition, new water storage tanks will be constructed. This project involves civil/site, mechanical, electrical, plumbing, structural, geotechnical, and architectural disciplines. The project must also comply with the DVAs Physical Security Resiliency Design Requirements (PSRDM). It is expected that the chilled water plant will be constructed to meet USGBC LEED Silver certification. The work is located adjacent to and within an active Medical Center campus which will be operational at all times. Impact to on-going operations must be kept to a minimum and carefully coordinated with the Contracting Officer and VAMC staff. In addition, the work area is constrained due to the active medical center operations which will limit laydown and storage areas during construction.
Similar open opportunities
- Barillas Peak & Encino Vista Lookout Tower Restoration, Santa Fe NFThe U.S. Forest Service (Southwest) wants quotes to design and replace the cab (the room at the top) of the Barillas Lookout Tower on the Santa Fe National Forest in New Mexico,…
- Trade and Cargo AcademyThe Army Corps of Engineers Charleston District wants a contractor to build a Trade and Cargo Academy and a Cargo Security and Seized Property Training Facility at the Federal…
- FCKY UEPH Barracks CM@RiskThe Army Corps of Engineers (Louisville District) is doing market research for construction of Unaccompanied Enlisted Personnel Housing (barracks) at Fort Campbell, KY, using a…
- Lease Fit-Out Construction in Nuuk, Greenland - Sources Sought/Market ResearchThe U.S. Department of State (Bureau of Overseas Buildings Operations) is doing market research for a construction contract to fit out three floors of a leased, occupied building…
- Fort Lee Vehicle Recovery RangeThe Army Corps of Engineers (Norfolk District) wants a contractor to build 24 concrete turning pads with site drainage and road alignment and repair at Fort Lee, Virginia.