Award Notice
Bldg. 1025 HVAC at Kirtland AFB
Dept of Defense · Dept of the Army · Sol. W912PP26QA045
No deadline8(a) sole sourceClosed
This contract has been awarded
Awarded to Colt Builders Inc for $207K on Sep 29, 2026.
Recent Army contract awards: who won →
These similar contracts are still open:
- CON | Z2DA | REPLACE CHILLER 1 B104 | 580-24-111 | PRESOLICITATIONThe VA medical center in Houston, TX plans to replace a failed 1,000-ton chiller (plus transformer, piping, valves and controls) in Building 104.
- Joint Base MDL - Kitchen Exhaust Hood MaintenanceThe 87th Contracting Squadron at Joint Base McGuire-Dix-Lakehurst, New Jersey, wants a contractor to maintain and certify commercial kitchen exhaust hoods, including plenum water…
- Bldg. 100 Roof Top AHU-8 ReplacementThe VA Palo Alto Health Care System (through Network Contracting Office 21) plans to replace a rooftop air handling unit (AHU-8) in Building 100 at the Palo Alto VA Medical…
- Building 450 Fire Suppression System InstallationThe Air Force (a nonappropriated-fund entity at Grissom Air Reserve Base, Indiana) wants a design-build contractor to build a new heated, fire-rated 32' x 16' office inside…
- Troubleshoot & Repair of Portable Chillers Service RequirementThe 502nd Contracting Squadron (Air Force) wants a small business to troubleshoot, repair and restore eight portable chillers at Joint Base San Antonio (Lackland and Fort Sam…
AI summary Beta
No AI summary for this notice yet.
Save it to generate your own AI brief in its bid workspace: a plain-English summary, the red flags, and how well your business fits.
Key facts
- Posted
- Sep 29, 2026
- Notice type
- Award Notice
- Solicitation
- W912PP26QA045
- Agency
- Dept of Defense · Dept of the Army
- Office
- W075 Endist Albuquerque
- Set-aside
- 8(a) Sole Source (FAR 19.8)
- NAICS
- 238220
- Product/service code
- Y1NZ
- Business type
- Construction & renovation
- Place of performance
- Kirtland AFB, NM, 87117
- Contracting contact
- GLENDA KOHLIEBERGlenda.D.Kohlieber@usace.army.mil5754796095102
Before you respond
Full notice text from SAM.gov
This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act. The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 1025 HVAC. Construction Contractor to provide and install an 8.5”x20.5” duct hood over the air compressor heat exhausts that transition to 14” ø round duct. Duct hood must be detachable to allow for the removal of the compressor top plate for maintenance. Contractor to remove SF-1 and wall louver. Expand existing 12”x18” wall penetration to 18”x18” penetration on the South wall. Install wall mounted exhaust fan rated for 1500 CFM @ 1” W.C. with using single phase 208V with soft start motor. Fan and motor must be rated to handle 140°F exhaust air. Provide 18”x18” ducted exhaust plenum 2’ into the mechanical room. Route 14”ø duct from each compressor into the 18”x18” plenum. Utilize conical fittings for branch take-offs and 30° minimum rectangular to round transitions and 1.5D round elbows. Provide gasketed low leakage motorized control dampers on each 14”ø duct between the hood and the exhaust plenum. Contractor to provide a 3-ton (36,000 BTU/hr) wall mounted mini split air conditioning unit on west wall above the compressed air desiccant driers. Mount wall mounted unit on available space without moving existing compressed air piping or conduit. Secure unit to wall per manufacturer instructions. Route condensate to nearest floor sink. Terminate condensate pipe above floor sink rim. Size per manufacturer requirements. Contractor to provide mini split condensing unit with high ambient kit by the same manufacturer. Locate exterior unit between stairs to electrical room and mechanical room. Secure unit to the ground per manufacturer instructions or mounted on C-channel with concrete anchors. Mini split must be 208V single phase. Contractor to provide and install refrigerant line sets between mini split per manufacturer instructions. Flash and seal new penetration for line set. Provide controls for equipment as follows: Exhaust fan must start when either compressor activates. Fan must remain on for at least 5 minutes (adjustable up to at least 15 minutes) after compressor turns off. Motorized control dampers must open when associated air compressor is activated. Damper must stay open until the exhaust fan turns off. Provide duct access panel for each damper on the bottom of the duct. Provide thermostat for new mini split. Set temperature to 85°F (adjustable). All new duct and duct connections shall be sealed to Class A and hung from the structure or mechanical room walls (where allowed) per SMACNA HVAC Duct Construction Standards. Provide 1in. W.C. Duct Pressure Classification on all exhaust duct systems, provide a minimum 22 Ga. Galvanized sheet metal meeting ASTM A924/A924M and ASTM A653/653M for all exhaust duct as indicated on the supplemental drawings. Provide power to the new exhaust fan and motorized control dampers from Panel P1. Reuse of conduit from demolished supply fan is acceptable provided it meets all NEC requirements. Provide power to mini split air conditioner from panel LM1. All wiring must be provided per NEC. Provide disconnects to exhaust fan, condensing unit and indoor unit per UFC 3-410-01. Contractor will need to be escorted at all times with the construction schedule coordinated with the facility user. All new penetrations between the electrical and mechanical rooms must be sealed with fire caulk. The North and East walls in the Mechanical Room cannot have any new penetration or be utilized to mount hang or hang any new equipment.