Solicitation
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Dept of Defense · Dept of the Army · Sol. W912DS26RA032
Due in 12 days
AI summary Beta
Some details are in the notice's attachments, which this summary didn't read. Check the attachments on SAM.gov.
The Army Corps of Engineers New York District is seeking proposals for a two-phase design-build contract for Phase II of the Port Monmouth flood and storm protection project in Port Monmouth, NJ. Phase II covers a tide gate, levees, floodwalls, pump stations and related work.
Watch out for
- Large, complex civil construction. Pump stations, a tide gate, levees and wetland mitigation in a design-build project will likely need strong bonding and experience, which can be hard for a small business.
- Two-phase selection process. Proposals are evaluated in stages, which takes more effort and time to prepare than a single-step bid.
Phase I of a Two Phase BVTO posted.
- Large files split up. The 30% design package was broken into pieces, so you need to collect all parts and amendments.
RTA 30% Package broken up and uploaded due to SAM size limitation.
Read from the notice text only.
Full brief
What they want
- Design and build Phase II flood risk management components
- Tide gate, levees and floodwalls
- Two pump stations
- Three road closure structures, plus road raising and regrading
- Wetland mitigation
- Contract type
- Two-phase design-build (Phase I of a Two Phase BVTO, as stated in the notice)
- Place of performance
- Port Monmouth, NJ, USA
- How they'll choose
- Two-phase best value tradeoff (BVTO); details are in the selection procedure documents
- Offers due
- 2026-10-19T14:00:00-04:00
What to include when you submit
- Phase I and Phase II DB Selection Procedure documents are posted with Amendment 0001; follow them for submission steps
Not in the notice text
- Contract value or magnitude of construction
- Evaluation factors and their order
- How and where to submit the proposal
- Contract duration
- Bonding and other eligibility requirements
Is this a fit for your business?
Create a free accountFedReady checks notices like this against your business profile, tracks deadlines, and alerts you to new matches. Creating an account is free.
Key facts
- Response due
- Oct 19, 2026, 6:00 PM UTC
- Posted
- Oct 2, 2026
- Notice type
- Solicitation
- Solicitation
- W912DS26RA032
- Agency
- Dept of Defense · Dept of the Army
- Office
- W2SD Endist New York
- NAICS
- 237990
- Product/service code
- Y1PZ
- Business type
- Construction & renovation
- Place of performance
- Port Monmouth, NJ
- Contracting contact
- Adrian Stafford-Browneadrian.j.stafford-browne@usace.army.mil
- Versions
- 4 (amended since first posted)
Full notice text from SAM.gov
As of 02 October 2026: Amendment 0001 posted along with Phase one and Phase Two DB Selection Procedure documents. As of 18 September 2026: RTA 30% Package broken up and uploaded due to SAM size limitation. As of 17 September 2026: Phase I of a Two Phase BVTO posted. The Port Monmouth project consists of shore protection components (Phase 1) as well as flood risk management components (Phase II). The project provides for reduction of storm damages to low-lying residential and commercial structures from coastal erosion, tidal flooding, and inland flooding along Pews and Compton Creeks caused by high surface events in Raritan Bay. Phase II flood risk management components consist of a tide gate, levees, floodwalls, two pump stations, three road closure structures, road raising and regarding, and wetland mitigation. The State of New Jersey, acting through the New Jersey Department of Environmental Protection (NJDEP), is the non-Federal sponsor for the project.
Similar open opportunities
- Mary Rhodes Pump Station: Emergency Streambank Erosion ProtectionThe U.S. Army Corps of Engineers Galveston District is asking industry whether it can protect the Mary Rhodes Pump Station in Bay City, TX from Lower Colorado River bank erosion.
- FORT PIERCE HARBOR MAINTENANCE DREDGING, ST. LUCIE COUNTY, FLORIDAThe Army Corps of Engineers (Jacksonville District) wants a contractor to do maintenance dredging of Fort Pierce Harbor, FL and place the dredged sand on Fort Pierce Beach.
- Repair Aids to Navigation (ATON) - Southern Area of USCG District NortheastThe U.S. Coast Guard (Northeast District) wants a contractor to repair, replace or demolish seven aids-to-navigation structures (lights and towers) in New York, Connecticut and…
- Chief Joseph Dam (CJD) Intake Concrete Stairs RepairThe Army Corps of Engineers (Seattle District) is doing market research for repairing the concrete stair landings at the intake of Chief Joseph Dam in Bridgeport, WA. This is a…
- Fall River Lake and Dam Damsite Park Lagoon RepairThe U.S. Army Corps of Engineers (Tulsa District) wants quotes from small businesses to repair, rebuild and modernize the wastewater lagoons at Damsite Park, Fall River Lake and…