Solicitation
FDRMC ENGINEERING SUPPORT SERVICES
Dept of Defense · Dept of the Navy · Sol. N6817126RN005
AI summary Beta
Some details weren't available to this summary, so it may miss requirements. Check the attachments on SAM.gov.
NAVSUP Fleet Logistics Center Sigonella (Naples office) wants contractor engineers, technicians and maintenance planners to support the Navy's Forward Deployed Regional Maintenance Center (FDRMC) in Bahrain, Naples (Italy) and Rota (Spain), with some work in Romania and Poland and aboard ships. It is a cost-plus-fixed-fee task order under SeaPort NxG, open only to active SeaPort holders, running from 1 March 2027 for a base year plus four option years and a possible 6-month extension (to 31 August 2032). About 96,096 labor hours are estimated in total.
Watch out for
- Limited to SeaPort NxG holders. A company without an active SeaPort NxG contract cannot bid as a prime and would have to join a holder as a subcontractor on its team.
Only active SeaPort contract holders are invited to bid.
- Facility clearance and JCCS registration required up front. Offerors who do not already have a facility clearance and JCCS registration will be rated unacceptable in Phase 1 and dropped before technical review.
Offerors shall provide their JCCS registration number with the offer for themselves and proposed subcontractors.
- Cleared staff and Top Secret roles. Every position needs at least a Secret clearance and the CANES network role needs Top Secret, which makes hiring and staffing slow and expensive.
Combat Systems Technician (CANES/Afloat Network), which requires TOP SECRET clearance. Personnel performing classified work or
- Cost-reimbursement contract needs mature accounting and rate support. You need an approved accounting system or SF 1408, three years of indirect rate history, payroll proof and a detailed cost narrative, which is heavy for a small firm.
If the Offeror or any cost reimbursement subcontractors do not have an approved accounting system, then an SF1408 Pre-Award Survey shall be
- Overseas work in several countries. Staff must work in Bahrain, Italy and Spain, with travel to Romania, Poland and ships, and you must handle visas, insurance and host-country access.
Contractor shall comply with host country access requirements, including (but not limited to) obtaining appropriate work visas, contractor insurance,
- Pricing type inconsistent in the solicitation. The notice and fee clauses say cost-plus-fixed-fee, but the labor lines in Section B are labeled labor hour; the pricing form to use should be confirmed with the contracting officer.
Pricing Arrangement: Labor Hour
- Fee capped and costs adjusted upward if too low. Fixed fee cannot exceed 8.0% and the Government will raise costs it finds unrealistically low, so underbidding will not help.
Note Fixed Fee is limited to a maximum of 8.0% for both prime and any subcontractor(s).
- Unpaid start-up period and long security lead time. Clearances, CAC cards and system access forms must be done before start, and you cannot bill for start-up work, so staffing cost falls on you before 1 March 2027.
Invoicing by the contractor will begin as of the commencement of the performance period of services and no reimbursement will be paid by
- Key staff locked in for 120 days. People named in your proposal generally cannot be swapped out for the first 120 days, so you need committed hires or contingent offers when you submit.
will be available for performance and shall not be replaced during
Read from the notice and 8 attachments. 3 not read in full.
- Solicitation - N6817126RN005.pdf
- Attachment 08 CDRL_A0002_ROSTER.pdf
- Attachment 06 QUALITY ASSURANCE SURVEILLANCE PLAN.docx
- Attachment 10 CDRL_A0004_TRIP REPORT.pdf
- Attachment 09 CDRL_A0003_ODC REPORT.pdf
- Attachment 07 CDRL_A0001_CO MGMT REPORT.pdf
- Attachment 03 DD Form 254_ENG.pdf
- Attachment 02 Past Performance Questionnaire.docx
- Attachment 05 Support for Unloaded Labor Rates and Costs.xlsx: spreadsheet: not read yet
- Attachment 04 Calculation of Indirect Costs.xlsx: spreadsheet: not read yet
- Attachment 01 Past Performance Information.doc: .doc files aren't read yet
Full brief
What they want
- Provide on-site engineering technicians: mechanical auxiliary, mechanical hydraulics, marine gas turbine inspector, SPY radar technician and CANES/afloat network technician (11,616 hours each over the full period)
- Provide a METCAL (metrology and calibration) program technician, mainly at Rota (11,616 hours)
- Provide production controllers: D-level planner and IMA planner (7,392 hours each) and dive planner (11,616 hours)
- Support fleet technical assistance, ship system assessments and fire/casualty response (Engineering Technical Branch) aboard U.S. Navy ships
- Staff to the Section B labor-hour table and keep named key people in place for the first 120 days
- Deliver monthly reports: cost management report, personnel roster, other direct cost report, and trip reports after travel
- Handle phase-in before the 1 March 2027 start and phase-out cooperation with the follow-on contractor
- Contract type
- Cost-plus-fixed-fee (CPFF) task order under SeaPort NxG, with cost-no-fee travel and other direct cost lines. The labor lines are labeled 'Labor Hour' in Section B, which conflicts with CPFF.
- Period of performance
- Base year 1 Mar 2027 - 28 Feb 2028, plus four 1-year options (through 29 Feb 2032) and a 52.217-8 extension of up to 6 months (1 Mar - 31 Aug 2032)
- Place of performance
- FDRMC Manama, Bahrain; FDRMC Naples, Italy (SAM.gov lists Capodichino); FDRMC Rota, Spain; other overseas sites including Romania and Poland; global TDY; mostly Government sites and Navy ships
- Estimated value
- Total dollar value not stated. Estimated total labor is 96,096 hours. Travel and other direct costs are estimated at $111,600 (base), $119,822.01, $123,416.67, $123,734.94, $127,446.99 (options 1-4) and $58,095.95 (extension). Fixed fee is capped at 8.0%.
- Contract vehicle
- SeaPort NxG (Navy multiple-award IDIQ); only active SeaPort contract holders may bid
- How they'll choose
- Best value tradeoff in two phases. Phase 1 is pass/fail on facility security clearance with JCCS registration and an essential services plan. Phase 2 weighs non-cost factors as significantly more important than cost, with a cost realism analysis.
- Offers due
- 2026-10-23 at 12:00 noon, local time (SAM.gov shows 12:00 at UTC+2, Italy time)
- How to submit
- Email (the Section B pricing, cost spreadsheets and subcontractor cost proposals are to be emailed). The email address and full submission instructions were in a part of the document that was cut off.
- Page limits
- Technical volume (Volume II) limited to 65 pages; past performance (Volume III) limited to 12 pages. Other volumes: not seen.
What they'll judge offers on
- Phase 1 (pass/fail): Facility Security Clearance with JCCS registration, and Essential Services written plan
- Factor 2: Technical (most important in Phase 2) - four equal sub-factors: Technical Approach, Management Approach, Personnel Approach, Transition Plan
- Factor 3: Past Performance (up to three references, recent and relevant within three years)
- Factor 4: Cost Proposal (cost realism analysis; least important, but its weight grows when proposals are close or the cost difference is large)
What to include when you submit
- Volume I (contract documentation) is not visible in the text provided; it includes a facility clearance letter and JCCS registration number for the offeror and each subcontractor
- Volume II Technical: technical approach, management approach with org chart, staffing plan matching the Section B hours, and transition plan with timeline
- Volume III Past Performance: up to three recent, relevant contracts with a Past Performance Information Form (Attachment 01) for each, and ask references to email the Past Performance Questionnaire (Attachment 02) by the closing date
- Volume IV Cost: Section B pricing for each CLIN, a cost spreadsheet with live formulas for the prime and each subcontractor, and a cost narrative
- Provide indirect rate support (Attachment 04) and unloaded labor rate support (Attachment 05), with three years of indirect rate history
- Show payroll screenshots or payroll verification for named employees and signed letters of intent for contingent hires
- Say whether you have a DCAA-approved accounting system; if not, complete an SF 1408 pre-award survey
- Prefix names of contingent hires with 'Contingent -' and use 'TBD' for unfilled positions
- Propose labor hours exactly as listed in Section B and propose only subcontractors registered as team members in SeaPort NxG
- Keep fees and pass-through rates within the maximums in your SeaPort IDIQ contract
You must have
- Must hold an active SeaPort NxG contract to bid
Only active SeaPort contract holders are invited to bid.
- Facility security clearance (Secret, interim accepted) and a JCCS registration number, checked pass/fail in Phase 1; subcontractors need a JCCS number too
Phase 1 will evaluate Facilities Security Clearance and JCCS registration status on an Acceptable/Unacceptable basis per the submission of the proof
- Written Continuation of Essential Contractor Services plan that meets DFARS 252.237-7023 and 252.237-7024
Continuation of Essential Contractor Services Plan is in compliance with DFARS 252.237-7023 and 252.237-7024
- Personnel clearances: Secret for all staff, and Top Secret for the CANES/afloat network technician
Applicant must have and maintain a Top-Secret clearance
- Marine Gas Turbine Inspector must hold a current Navy MGTI certification (NEC 4136 or U07A)
Must possess and submit proof of a current Marine Gas Turbine Inspector (MGTI) certification (Navy Enlisted Classification
- Minimum experience: three years of journeyman-level experience in the last five years, unless the labor category says otherwise
personnel must have a minimum of three (3) years of
- Employees must be U.S. citizens with a favorably adjudicated background investigation (T3 or equivalent)
At a minimum, each contractor employee must be a US citizen and have a favorably adjudicated NACLC or T3 or T3R equivalent investigation to
- Host country access: work visas, contractor insurance and base access for overseas sites
Contractor shall comply with host country access requirements, including (but not limited to) obtaining appropriate work visas, contractor insurance,
- A DCAA-approved accounting system, or a completed SF 1408 pre-award survey, for the offeror and cost-reimbursement subcontractors
If the Offeror or any cost reimbursement subcontractors do not have an approved accounting system, then an SF1408 Pre-Award Survey shall be
- Subcontractors must be registered team members in SeaPort NxG
Offeror shall propose only those subcontractors that are registered as team members in SeaPort-NxG.
Current contractor
A current contractor exists but is not named. The solicitation talks about phase-in, phase-out to a follow-on contractor, and hiring employees from the current contractor.
Not in the notice text
- Exact proposal submission email address and the opening instructions of Section L (about 31,000 characters in the middle of the solicitation were left out of the text provided)
- Contents and page limit of Volume I (contract documentation) and the Phase 1 submission details
- Date for questions and any amendments
- Total contract value and the fixed fee amounts (filled in only at award)
- Contents of Attachment 04 (indirect costs) and Attachment 05 (unloaded labor rates) spreadsheets and Attachment 01 (past performance form): not read
- Attachment 03 (DD Form 254 security specification) and the four CDRL attachments (07-10): the PDFs did not provide readable text
- Name of the incumbent contractor and the existing contract number
- Whether the small business set-aside box on the form applies (SAM.gov says no set-aside)
FedReady checks notices like this against your business profile, tracks deadlines, and alerts you to new matches. Creating an account is free.
Key facts
- Response due
- Oct 23, 2026, 10:00 AM UTC
- Posted
- Sep 18, 2026
- Notice type
- Solicitation
- Solicitation
- N6817126RN005
- Agency
- Dept of Defense · Dept of the Navy
- Office
- NAVSUP FLC Sigonella Naples Office
- Set-aside
- No Set aside used
- NAICS
- 541330
- Product/service code
- R425
- Business type
- Engineering, architecture & research
- Place of performance
- Capodichino, IT-72
- Contracting contact
- Ricardo Alberto Lopezricardo.a.lopez38.civ@us.navy.mil
Full notice text from SAM.gov
Similar open opportunities
- SOURCES SOUGHT Data at Rest (DaR) - 400 Obsolescence ResolutionThe Air Force (AFLCMC/WIW) is doing market research for installing and integrating a replacement for the E-3G AWACS DAR-400 data-at-rest unit, using a Government-owned KG-204…
- Electronic Dental Annual Help Desk SupportThe Indian Health Service (Wagner Health Center, South Dakota) is doing market research for one year of annual help desk support, maintenance and software updates for its Dentrix…
- Coordinated SECREP Management and Strategic Logistics Services (CSM_SLS)The Marine Corps (MARCORLOGCOM / Marine Forces Storage Command) wants logistics support for its Coordinated SECREP Management program and strategic logistics services.
- Sources Sought for Structural Engineer Expert ConsultantThe Army Corps of Engineers Philadelphia District is looking for a structural engineering expert to help the government defend a contractor claim before the Armed Services Board…
- RFP N62742-26-R-3601 Enterprise Construction Management Support Multiple Award Contract (ECMS MAC)NAVFAC Pacific plans to award multiple IDIQ contracts for construction management support (ECMS MAC) across the Navy's NAVFAC enterprise, covering the Atlantic and Pacific…