The U.S. Army Corps of Engineers, Tulsa District wants a design-build team for a roughly $235M program at Altus Air Force Base, Oklahoma. It will build two KC-46A hangars and a simulator facility to support the 97th Air Mobility Wing. Teams first submit a Statement of Qualifications; up to three go on to pitch presentations.
Watch out for
- Very large program. A program of about $235M calls for bonding capacity and past design-build experience that most small businesses lack, so a small firm would likely need to join a larger team.
This $235M consolidated capital program
- Other Transaction Authority agreement. This is not a standard FAR contract, so terms and protections can differ from what you may be used to.
using Progressive Design-Build under 10 USC 2808a Other Transaction Authority
- Price set later as design progresses. The final price is agreed in stages, so you take on design and cost risk before the price is locked.
The FFP for successive design and construction milestones will be agreed to as the design progresses and funds become available.
- Short window and pitch step. Only up to three teams move to a pitch presentation, so the first submission must be strong.
Read from the notice text only.
Full brief
What they want
- Design and build the KC-46A Aircraft Maintenance Hangar (General Maintenance)
- Design and build the KC-46A Multipurpose Hangar (Corrosion Control and Open-Tank Fuel Cell Maintenance)
- Design and build the KC-46A Simulator Facility Phase 4 (Flight Training Center Expansion)
- Build the associated airfield civil site infrastructure
- Provide design development and preconstruction services, then construction (Progressive Design-Build)
- Contract type
- Firm-Fixed-Price agreement using Progressive Design-Build under 10 USC 2808a Other Transaction Authority
- Place of performance
- Altus AFB, Oklahoma
- Estimated value
- $235M consolidated capital program
- How they'll choose
- Two-step selection: Statements of Qualifications, then pitch presentations from up to three down-selected teams; the most qualified team is awarded
- Offers due
- 2026-10-13 14:00 Central (-05:00), per the SAM.gov response deadline
What to include when you submit
- Step 1: submit a Statement of Qualifications
- Step 2: selected teams take part in pitch meetings
You must have
- No set-aside is listed; the work is large commercial and institutional building construction (NAICS 236220)
Not in the notice text
- What the Statement of Qualifications must contain and how it is submitted is not stated
- Evaluation factors and their weights are not stated
- Bonding, past performance and other qualification requirements are not stated
- Contract duration and construction schedule are not stated
- Whether a small business set-aside or subcontracting goals apply is not stated
Is this a fit for your business?
Create a free accountFedReady checks notices like this against your business profile, tracks deadlines, and alerts you to new matches. Creating an account is free.
Key facts
- Response due
- Oct 13, 2026, 7:00 PM UTC
- Posted
- Oct 2, 2026
- Notice type
- Solicitation
- Solicitation
- W912BV279A001
- Agency
- Dept of Defense · Dept of the Army
- Office
- W076 Endist Tulsa
- NAICS
- 236220
- Product/service code
- Y1BZ
- Business type
- Construction & renovation
- Place of performance
- Altus Afb, OK, 73523
- Contracting contact
- Daniel Foyildaniel.a.foyil@usace.army.mil9186697045
Full notice text from SAM.gov
The U.S. Army Corps of Engineers (USACE), Tulsa District is issuing this Request for Qualifications (RFQ) for the design and construction of the FY28 KC-46A Aircraft Beddown Infrastructure Program at Altus Air Force Base, Oklahoma using Progressive Design-Build under 10 USC 2808a Other Transaction Authority. The KC-46A Aircraft Beddown Infrastructure Program at Altus AFB, Oklahoma, will deliver comprehensive flight-line, industrial maintenance, and advanced aircrew flight simulator training facilities necessary to support the 97th Air Mobility Wing (97 AMW) - the Department of the Air Force’s sole formal training unit for heavy mobility aircraft. This $235M consolidated capital program will modernize the installation's infrastructure to replace Eisenhower-era KC-135 operations with the next-generation KC-46A Pegasus tanker while sustaining concurrent training and maintenance for its legacy fleets. The program will deliver three primary facility complexes along with associated airfield civil site infrastructure: KC-46A Aircraft Maintenance Hangar (General Maintenance) KC-46A Multipurpose Hangar (Corrosion Control & Open-Tank Fuel Cell Maintenance) KC-46A Simulator Facility Phase 4 (Flight Training Center Expansion) USACE will use a?streamlined?competitive selection process to select the most highly qualified design-build team:? Step?1 – Statement of Qualifications:?Interested parties will?submit?a?Statement of Qualifications. The Government intends to?down-select?up to?three Design-Build Teams?to?proceed?to?Step 2.? Step?2 –?Pitch Presentations:?Selected?Design-Build Teams?will?participate?in pitch?meetings.?One firm will be selected as the?Design-Build team?for?award?of the?initial?design?and preconstruction services?with a?modification for design completion and construction award.? The agreement will be awarded to the most qualified design-build team to provide design development, preconstruction services, and construction. Post-award Phase 1 of PDB includes design and pre-construction services and Post-award Phase 2 includes the final design and construction. The agreement will be Firm-Fixed-Price (FFP). The FFP for successive design and construction milestones will be agreed to as the design progresses and funds become available.
Similar open opportunities
- Barillas Peak & Encino Vista Lookout Tower Restoration, Santa Fe NFThe U.S. Forest Service (Southwest) wants quotes to design and replace the cab (the room at the top) of the Barillas Lookout Tower on the Santa Fe National Forest in New Mexico,…
- Trade and Cargo AcademyThe Army Corps of Engineers Charleston District wants a contractor to build a Trade and Cargo Academy and a Cargo Security and Seized Property Training Facility at the Federal…
- FCKY UEPH Barracks CM@RiskThe Army Corps of Engineers (Louisville District) is doing market research for construction of Unaccompanied Enlisted Personnel Housing (barracks) at Fort Campbell, KY, using a…
- Fort Lee Vehicle Recovery RangeThe Army Corps of Engineers (Norfolk District) wants a contractor to build 24 concrete turning pads with site drainage and road alignment and repair at Fort Lee, Virginia.
- P084 NEXT GENERATION TORPEDO INTEGRATION LAB, NAVAL STATION NEWPORT, NEWPORT RINAVFAC Mid-Atlantic wants a contractor to build a 12,920 SF multi-story steel-frame laboratory and office building for depot-level torpedo system testing at Naval Station…