NASA Goddard's Wallops Flight Facility (Virginia) wants a contractor to run and maintain the Wallops Range under the Range Operations Contract II (ROC II): tracking, telemetry, weather, optical and command-and-control services for rocket launches, aircraft, balloons and drones. It is a full and open (not set-aside), cost-plus-fixed-fee IDIQ follow-on to contract NNG16WA71C, with a total estimated value of $200M. The posted text and attachments mix draft-RFP, final-RFP and amendment material, and key RFP sections (B-M, the statement of work, most attachments) were not provided.
Things to watch
- Conflicting dates and notice type; no due date. The notice text talks about a draft RFP in March 2017 and a final RFP in May 2017, while the SAM.gov type is Solicitation and the attachments include a site visit, amendments and task order dates running into 2022, so you cannot tell from this text whether or when offers are due.
the anticipated release date of the Final Request for Proposal (RFP) is the end of May 2017.
- Large cost-type IDIQ needing audit-ready accounting. A $200M CPFF IDIQ requires detailed rate substantiation (three years of actual indirect expenses), DCMA/audit information and cost realism review, which is hard for small or new government contractors.
Cost plus Fixed Fee, Indefinite Delivery Indefinite Quantity contracting vehicle with a total estimated value of $200M
- High past performance thresholds with no exceptions. The prime needs recent similar contracts averaging $10M a year in cost/fee within 7 years, and the Government refused to lower thresholds for the prime or its significant subcontractors, which can shut out smaller firms unless they team.
- Possibly stale or already decided. The file list includes an unread document named ROC_II_Source_Selection_Statement.pdf, which may mean the competition has already been decided; confirm the current status on SAM.gov before spending time.
- Tight 75-page limit for a complex technical volume. The technical volume, staffing plan and all three representative task order responses must fit in 75 pages, so proposal writing needs to be concise.
limit of 75 pages.
- Documents disagree on the task order period. Representative Task Order 3 is described as one year in the standalone enclosure, as two years with the contractor choosing dates in Amendment 1, and as April 15, 2019 to April 14, 2021 in Amendment 2; follow the latest amendment and confirm.
The period of performance shall be April 15, 2019 through April 14, 2021
- Past performance recency stated two ways. One copy of the past performance questionnaire says only the past 7 years count and another says 5 years; the Q&A confirms 7 years.
past 5 years is relevant.
- Site visit registration is required for badging. Visitors needed to register by email in advance, with no more than 2 attendees per company; the notice does not say the visit itself was mandatory.
Mandatory Registration Instructions due to Badging Security Requirements:
Read from the notice and 12 attachments. 58 not read in full.
- SF33.pdf
- NNG17611358R_-_Site_Visit_Registration_and_Instructions.pdf
- NNG17611358R_-_Amendment_2.pdf
- ROC_II_RFP_-_Questions_89_through_107.pdf
- ROC_II_RFP_-_Questions_108_through_115.pdf
- NNG17611358R_DRFP_Q1.pdf
- NNG17611358R_DRFP_Q2-58.pdf
- NNG17611358R_DRFP_Q59-73.pdf
- NNG17611358R_-_Amendment_1.pdf
- Exhibits_1-16.pdf
- Exhibits_1-16.pdf
- Enclosure_5_-_Representative_Task_Order_3.pdf
- SF33-14a.pdf: scanned PDF: no text to read
- RFP_Cover_Letter.pdf: scanned PDF: no text to read
- Enclosure_5_-_Representative_Task_Order_3.pdf: over the file limit for one brief
- Enclosure_4_-_Representative_Task_Order_2.pdf: over the file limit for one brief
- Enclosure_4_-_Representative_Task_Order_2.pdf: over the file limit for one brief
- Enclosure_3_-_Representative_Task_Order_1.pdf: over the file limit for one brief
- Enclosure_3_-_Representative_Task_Order_1.pdf: over the file limit for one brief
- Enclosure_2_-_ROC_II_QA_Surveillance_Plan.pdf: over the file limit for one brief
- Enclosure_2_-_ROC_II_QA_Surveillance_Plan.pdf: over the file limit for one brief
- Enclosure_1_-_IT_Security_Management_Plan_Template.pdf: over the file limit for one brief
- Enclosure_1_-_IT_Security_Management_Plan_Template.pdf: over the file limit for one brief
- Attachment_A_-_Statement_of_Work.pdf: over the file limit for one brief
- Attachment_A_-_Statement_of_Work.pdf: over the file limit for one brief
- Sections_B-M.pdf: over the file limit for one brief
- Sections_B-M.pdf: over the file limit for one brief
- ROC_II_Site_Visit_Questions_20170828.pdf: over the file limit for one brief
- ROC_II_Site_Visit_Attendee_List_08282017.pdf: over the file limit for one brief
- ROC_II_DRFP_-_Questions_74_through_86.pdf: over the file limit for one brief
- DRFP_Cover_Letter.pdf: over the file limit for one brief
- ROC_II_-_Site_Visit_Itinerary_(20170822).pdf: over the file limit for one brief
- ROC_II_Source_Selection_Statement.pdf: over the file limit for one brief
- ROC_II_DRFP_-_Questions_87_through_88.pdf: over the file limit for one brief
- Attachment_S_-_Key_Personnel_and_Qualifications.pdf: over the file limit for one brief
- Attachment_S_-_Key_Personnel_and_Qualifications.pdf: over the file limit for one brief
- Attachment_R_-_GFP.pdf: over the file limit for one brief
- Attachment_R_-_GFP.pdf: over the file limit for one brief
- Attachment_Q_-_PIV_Card_Issuance_Procedures.pdf: over the file limit for one brief
- Attachment_Q_-_PIV_Card_Issuance_Procedures.pdf: over the file limit for one brief
- Attachment_P_-_Contractor_Proposed_Enhancements.pdf: over the file limit for one brief
- Attachment_P_-_Contractor_Proposed_Enhancements.pdf: over the file limit for one brief
- Attachment_O_-_IT_Security_Applicable_Documents_List.pdf: over the file limit for one brief
- Attachment_O_-_IT_Security_Applicable_Documents_List.pdf: over the file limit for one brief
- Attachment_N_-_Risk_Management_Plan.pdf: over the file limit for one brief
- Attachment_N_-_Risk_Management_Plan.pdf: over the file limit for one brief
- Attachment_M_-_Contract_Historical_Data.pdf: over the file limit for one brief
- Attachment_M_-_Contract_Historical_Data.pdf: over the file limit for one brief
- Attachment_L_-_OCI_Avoidance_Plan.pdf: over the file limit for one brief
- Attachment_L_-_OCI_Avoidance_Plan.pdf: over the file limit for one brief
- Attachment_K_-_DD254.pdf: over the file limit for one brief
- Attachment_K_-_DD254.pdf: over the file limit for one brief
- Attachment_J_-_Quality_Assurance_Plan.pdf: over the file limit for one brief
- Attachment_J_-_Quality_Assurance_Plan.pdf: over the file limit for one brief
- Attachment_G_-_IT_Security_Management_Plan.pdf: over the file limit for one brief
- Attachment_G_-_IT_Security_Management_Plan.pdf: over the file limit for one brief
- Attachment_F_-_Small_Business_Subcontracting_Plan.pdf: over the file limit for one brief
- Attachment_F_-_Small_Business_Subcontracting_Plan.pdf: over the file limit for one brief
- Attachment_E_-_Safety_and_Health_Plan.pdf: over the file limit for one brief
- Attachment_E_-_Safety_and_Health_Plan.pdf: over the file limit for one brief
- Attachment_D_-_IAGP.pdf: over the file limit for one brief
- Attachment_D_-_IAGP.pdf: over the file limit for one brief
- Attachment_C_-_Direct_Labor_Rates_Indirect_Rates_and_Fee_Profit_Matrices.pdf: over the file limit for one brief
- Attachment_C_-_Direct_Labor_Rates_Indirect_Rates_and_Fee_Profit_Matrices.pdf: over the file limit for one brief
- Attachment_B_-_Program_Management_Plan.pdf: over the file limit for one brief
- Attachment_B_-_Program_Management_Plan.pdf: over the file limit for one brief
- Attachment_I_-_Wage_Determinations.pdf: over the file limit for one brief
- Attachment_I_-_Wage_Determinations.pdf: over the file limit for one brief
- Attachment_H_-_Financial_Management_Reporting_Requirements.pdf: over the file limit for one brief
- Attachment_H_-_Financial_Management_Reporting_Requirements.pdf: over the file limit for one brief
Full brief
What they want
- Operate and maintain Wallops Range instrumentation: tracking, telemetry, meteorological, optical, and command and control services
- Support launches and flights of orbital and suborbital rockets, aircraft, satellites, balloons and unmanned aircraft systems, including real-time display and capture of flight, payload and science data
- Support services, training, and command, control, communications, information and computer systems services
- Test, modify, install and operate communications, electronic, ground support, and spacecraft and launch vehicle processing systems at launch facilities, control centers and test facilities
- Operate and maintain suborbital launch systems and provide ground operations (launch pad, blockhouse, vehicle and payload processing)
- Develop flight and ground systems technology and sustaining engineering for the range
- Respond to task orders with task plans: example tasks are a Poker Flat (Alaska) sounding rocket campaign plus an Antares launch, a Mission Graphics system replacement study, and routine Wallops range operations (UAS flights, Patuxent River support, Navy target launches, twice-daily National Weather Service balloons)
- Deliver reports and plans such as weekly activity reports, monthly status reports, range readiness review packages and post-mission reports
- Contract type
- Cost-plus-fixed-fee (CPFF) Indefinite Delivery Indefinite Quantity (IDIQ) contract. Firm-fixed-price task orders will be used only for clearly defined work such as spare parts, likely a small percentage.
- Period of performance
- Ordering period of 5 years per Q&A (performance may continue into a sixth contract year under the IDIQ clause); phase-in transition of no longer than 60 days; contract effective date given in a Q&A as April 1, 2018. Dates as written in the documents.
- Place of performance
- Not given in the SAM.gov fields. The notice describes work on Wallops Range instrumentation; the site visit was at NASA Wallops Flight Facility, Wallops Island, VA; example task orders also mention Poker Flat Research Range in Fairbanks, Alaska and an off-range site in Bermuda.
- Estimated value
- Total estimated value of $200M (also shown as the IDIQ maximum ordering value of $200M in the Q&A)
- Contract vehicle
- Single IDIQ contract (RFP NNG17611358R), Full and Open competition; no schedule or contract vehicle required
- How they'll choose
- Negotiated procurement under FAR Part 15. Offers are submitted in separate volumes: Mission Suitability (technical approach including three representative task orders, management approach, small business subcontracting), Cost (cost realism and probable cost, including the 60-day phase-in), and Past Performance. The relative weights of the factors are not in the text provided.
- Offers due
- No due date given in the SAM.gov fields or the provided documents.
- How to submit
- Solicitation documents were to be posted on Federal Business Opportunities (fbo.gov); contractual and technical questions go by email to Bruce.B.Tsai@nasa.gov (no phone questions). The method of submitting the offer is not stated in the text provided.
- Page limits
- Mission Suitability volume: 75 pages (the Government kept this limit; the staffing plan and the representative task order responses count against it). Written consent letters from significant subcontractors are excluded from the past performance page count.
What they'll judge offers on
- Mission Suitability: Subfactor A Technical Approach (statement of work areas and three representative task orders), Subfactor B Management Approach (program management plan, staffing, key personnel, risk), Subfactor C Small business subcontracting
- Cost: cost realism and probable cost of the representative task orders, phase-in cost, and Attachment C rate matrices
- Past Performance: recent similar contracts, references and past performance questionnaires
What to include when you submit
- Prospective offerors must notify the contracting office of their intent to submit an offer
- Offer Volume contents are set by Provision L.12; Attachment P (Contractor Proposed Enhancements) is to be proposed with the Offer Volume
- Write task plans (Task Implementation Plans) for the three representative task orders, with a Basis of Estimate at the lowest WBS level (not lower than WBS level 3)
- Cost Volume exhibits are issued only as PDF; offerors must convert them to Excel; Exhibit 2A needs a separate worksheet for each level 3 WBS area
- Attachment C labor and indirect rates are 'not to exceed' rates and the representative task order rates must match them; support indirect rates with the prior three years of actual expenses
- Propose a firm-fixed price for the phase-in period of no longer than 60 days; it is included in the cost evaluation
- Past performance: send questionnaires to references (returned to Bruce Tsai, NASA Goddard, Code 210) and provide written consent letters for significant subcontractors
You must have
- Open to all responsible sources under full and open competition; no small business set-aside
This is a Full and Open competitive follow-on contract for the support services currently provided under contract NNG16WA71C.
- NAICS 517919 with a size standard of $32.5 million (relevant to size status and subcontracting plan)
The NAICS code and size standard selected are 517919 and $32.5 million, respectively.
- Small business subcontracting goals are set for this procurement, and offerors must submit a small business subcontracting plan
Total Small Business: 23%, Small Disadvantages Business 5%, Women Owned Small Business 3.5%
- Recent, relevant past performance on similar contracts. Per Q&A, the prime must show contracts for similar efforts with a minimum average annual cost/fee of $10M within the last 7 years; significant subcontractors (about $6M a year or more) must also show past performance
past 7 years is relevant.
- Contractor-proposed plans and key personnel are part of the offer (program management, safety and health, risk management, small business subcontracting, key personnel qualifications)
Current contractor
This is a follow-on to the support services currently provided under contract NNG16WA71C (the incumbent contractor is not named in the text provided). A Q&A also notes an incumbent would benefit from a zero-cost phase-in.
Not in the notice text
- Offer due date and time, and how offers must be submitted (not in the text provided)
- Relative importance of Mission Suitability, Cost and Past Performance (Sections L and M were not provided)
- Statement of work details (Attachment A) and the full Sections B-M
- Security requirements (DD254, Attachment K) and any facility clearance needed
- Exact contract effective date and length given the mixed dates in the documents
- Whether the competition is still open (a Source Selection Statement file is listed but not read)
- Wage determinations, Attachment C rate matrices and government-furnished property details
FedReady checks notices like this against your business profile, tracks deadlines, and alerts you to new matches. Creating an account is free.
Key facts
- Posted
- Jun 19, 2019
- Notice type
- Solicitation
- Solicitation
- NNG17611358R
- NAICS
- 517919
- Product/service code
- M
- Business type
- IT, software & telecom
- Contracting contact
- Bruce B. Tsaibruce.b.tsai@nasa.gov2406840428
- Versions
- 2 (amended since first posted)
What similar contracts paid
12 contracts across all agencies for the same NAICS and product/service codes had activity in the last 5 years, according to USAspending.gov. Small businesses won 9% of the dollars in this market over the last 3 fiscal years.
Before you respond
Full notice text from SAM.gov
Similar open opportunities
- PANEL PC, IN REPAIR/MODIFICATION OFNAVSUP Weapon Systems Support Mechanicsburg plans to buy repair or modification of one PANEL PC (NSN 7H-7025-016924379), delivered to DLA Distribution in New Cumberland, PA. It…
- CONVERTER,ANALOG TO
- (New Action): VA Procurement Policy Documentation Control Software (VA-27-00008195)The VA Office of Procurement Policy is asking vendors (a Request for Information, not a solicitation) about a document control system for Standard Operating Procedures, forms and…
- Qgenda On-call Full Range (FR) Scheduling Software (VA-27-00011101)The Department of Veterans Affairs (Technology Acquisition Center) is asking vendors for information about supplying brand name QGenda On-Call Full Range, a clinical scheduling…
- Travel Management Office (TMO) Travel Program (Defense Travel System (DTS) & Government Travel Charge Card (GTCC)) and Mail Management Center (MMC) Technical and Administrative Support Services.Navy Strategic Systems Programs (SSP) is doing market research for Travel Management Office support (Defense Travel System and government travel charge card) and Mail Management…