Solicitation
Fort Lee Vehicle Recovery Range
Dept of Defense · Dept of the Army · Sol. W9123626BA006
Due in 15 hr left8(a)
AI summary Beta
No AI summary for this notice yet.
Save it to generate your own AI brief in its bid workspace: a plain-English summary, the red flags, and how well your business fits.
Is this a fit for your business?
Create a free accountFedReady checks notices like this against your business profile, tracks deadlines, and alerts you to new matches. Creating an account is free.
Key facts
- Response due
- Sep 29, 2026, 6:00 PM UTC
- Posted
- Aug 25, 2026
- Notice type
- Solicitation
- Solicitation
- W9123626BA006
- Agency
- Dept of Defense · Dept of the Army
- Office
- W2SD Endist Norfolk
- Set-aside
- 8(a) Set-Aside (FAR 19.8)
- NAICS
- 236220
- Product/service code
- Y1PZ
- Business type
- Construction & renovation
- Place of performance
- Fort Lee, VA
- Contracting contact
- Michael Stevensonmichael.l.stevenson@usace.army.mil(757) 201-7233
- Versions
- 5 (amended since first posted)
Full notice text from SAM.gov
Amendment 0005: An amendment has been made to Solicitation W9123626BA0006. Please see attachment SF30, Solicitation Amendment W9123626BA006_0005. This amendment incoporates the correct solicitaion documents dated May 26, 2026 to replace the previous inadvertently issued solicitation documets dated November 2025. This amendment also reopens ProjNet and extends the bid due date and bid opening date. Please see the amendment for the complete summary of change. The purpose of this project is to construct 24 concrete turning pads, along with required site drainage improvements and road alignment and repair as necessary. The contract will be executed in three distinct phases, with the contractor granted access to only one phase at a time. Completion of each phase is required before proceeding to the next. The remaining phases (two and three) will only be performed if the options for phases are exercised. During construction activities in one phase, the Army will conduct training operations in the remaining two phases. Each turning pad, as identified in the project drawings, will require excavation of the existing roadbed and placement of concrete in accordance with the design specifications. Storm drainage systems will be installed to ensure positive site drainage throughout the construction process. Upon proper curing of the concrete turning pads, the connecting roads will be regarded and aligned to seamlessly integrate with the pads, as detailed in the contract drawings.
Similar open opportunities
- Drop Ceiling Demo, Disinfect and Replace at the Brooklyn VA Medical CenterThe VA's Network Contracting Office 2 wants a Service-Disabled Veteran-Owned Small Business to remove damaged drop ceiling materials, clean and disinfect the space above, and…
- Sources Sought / Market Intelligence: Multi-Projects for Army Reserve Program – Construction Management at Risk (CM@Risk) utilizing Other Transaction Authority (OTA)The U.S. Army Corps of Engineers, Louisville District, is gathering market intelligence (not yet soliciting) about industry interest in building three separate Army Reserve…
- 635-21-139 | Repair Parking Garage 1 Deficiencies | CON (VA-26-00041470) (NRM - SCIP# VHA19-635-2023-52398)The VA (Network Contract Office 19) needs an SDVOSB contractor to repair deficiencies in Parking Garage 1 at the Oklahoma City VA Medical Center, including striping, an ADA…
- 620-23-206 and 620-20-105 Renovate B. 14 AB and CD
- Fort Campbell Air Traffic Control Tower