Solicitation
ALPO STABILIZATION OF STAPLE BEND TUNNEL
Department of the Interior · National Park Service · Sol. 140P4226R0026
Due in 26 daysSmall business
AI summary Beta
Some details are in the notice's attachments, which this summary didn't read. Check the attachments on SAM.gov.
The National Park Service is seeking a contractor to stabilize Staple Bend Tunnel at Allegheny Portage Railroad National Historic Site near Johnstown, PA. It is a total small business set-aside. Offers are due October 30, 2026 at 4:00 PM Mountain Time, extended by Amendment 0001.
Watch out for
- Site visit and hard access to the site. The site visit starts at a trailhead, a shuttle takes a limited number of vehicles to the tunnel, and late arrivals must hike 2 miles on their own.
Any contractors that arrive late, and miss the shuttle departure, will have to make the 2-mile hike on their own.
- Site visit date may already have passed. The notice lists the organized site visit as August 26, 2026, which is before this notice was posted, so ask the contracting officer whether another visit is planned.
An organized site visit has been scheduled for: Wednesday, August 26, 2026, at 10 AM Eastern.
Read from the notice text only.
Full brief
What they want
- Tunnel stabilization work at Staple Bend Tunnel, Allegheny Portage Railroad National Historical Site
- Place of performance
- Staple Bend Tunnel, Allegheny Portage Railroad National Historical Site, Johnstown, PA
- Offers due
- Friday, October 30, 2026, 1600 Mountain Time
You must have
- Total small business set-aside (per the notice header)
Not in the notice text
- Scope of work, specifications and contract type are in the solicitation documents, not in this text
- Evaluation method and factors
- How to submit quotes or offers
- Estimated value, bonding and period of performance
- Whether any later site visit is scheduled
Is this a fit for your business?
Create a free accountFedReady checks notices like this against your business profile, tracks deadlines, and alerts you to new matches. Creating an account is free.
Key facts
- Response due
- Oct 30, 2026, 10:00 PM UTC
- Posted
- Sep 17, 2026
- Notice type
- Solicitation
- Solicitation
- 140P4226R0026
- Agency
- Department of the Interior · National Park Service
- Office
- Doi, NPS Conops Strategic
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 237990
- Product/service code
- Z1QA
- Business type
- Construction & renovation
- Contracting contact
- McCabe, Brianbrian_mccabe@ios.doi.gov2023397772
Full notice text from SAM.gov
Allegheny Portage Railroad National Historical Site (ALPO) - Tunnel Stabilization of Staple Bend Tunnel Amendment 0001 extends the closing date and time to Friday, October 30, 2026 by no later than 1600 Mountain Time. The full solicitation is now posted in SAM.gov, including all related documents. An organized site visit has been scheduled for: Wednesday, August 26, 2026, at 10 AM Eastern. Participants will meet at: Staple Bend Tunnel - Trailhead Parking Lot (For specific directions see Section C.5) 1258 Beech Hill Road Johnstown, PA 15942 A NPS shuttle will either transport and/or lead a limited number of vehicles from the Trailhead Parking Lot to the site. Any contractors that arrive late, and miss the shuttle departure, will have to make the 2-mile hike on their own. They will NOT be allowed to drive to the site location on the trail leading to the Staple Bend Tunnel on their own once shuttle has departed.
Similar open opportunities
- Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)The U.S. Army Corps of Engineers, Kansas City District, wants a contractor to design and build access manholes to an existing seepage collection system in the Fairfax-Jersey…
- Borough of Etna, Pennsylvania, Local Protection Project (LPP) PL84-99 RehabilitationThe U.S. Army Corps of Engineers Pittsburgh District wants a contractor to repair storm-damaged creek channel and embankment on the Etna Federal Local Protection Project along…
- Sources Sought/Request for Information Upper Mississippi River Restoration (UMRR) – Quincy Bay Habitat Rehabilitation and Enhancement Project- Stage 1The Army Corps of Engineers, Rock Island District, is doing market research (a sources sought notice) for Stage 1 of the Quincy Bay habitat project on the Upper Mississippi River…
- RIO DE LA PLATA FLOOD CONTROL PROJECT, SUPPLEMENTAL CONTRACT 1 PROJECT LOCATION: DORADO AND TOA BAJA, PUERTO RICOThe Army Corps of Engineers (Caribbean District) is seeking proposals for one firm-fixed-price design-bid-build construction contract for the Rio de la Plata Flood Control…
- USACE SPK DB Construction - Natomas NPP Named Pumping Plants - Sacramento, CAThe U.S. Army Corps of Engineers Sacramento District wants a contractor to renovate three irrigation pumping plants (Elkhorn, Riverside and Pritchard) along the Garden Highway…