Solicitation
VALVE,COMBINATION
Dept of Defense · Dept of the Navy · Sol. N0010426QTC43
Due in 22 days
AI summary Beta
NAVSUP Weapon Systems Support (Navy, Mechanicsburg PA) wants a contractor to repair combination valves (a repair buy, not new parts). The Navy is seeking a 354 day repair turnaround time, and late units get a price reduction. No set-aside applies and quotes are due October 26, 2026.
Watch out for
- Late repair price reductions. Every asset that misses the turnaround time gets a price cut per unit per month, and the Government can also terminate for default.
will incur a price reduction per unit/per month the contractor is late
- Cybersecurity certification (CMMC) clause. A CMMC notice is included but the required level is not stated in the text, and getting certified can be costly for a small firm.
NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))
- Government source inspection and CAV reporting. Government inspectors must inspect at your facility, and you must log every transaction in the Navy's CAV system within five business days.
Government Source Inspection (GSI) is required.
- Long turnaround target and open-ended option. The Government wants a 354 day repair time and may add more units at the quoted unit price, so price your quote to hold for the option quantity.
The Government intends to add an option quantity to the resultant contract.
Read from the notice text only.
Full brief
What they want
- Repair the VALVE,COMBINATION to meet the operational and functional requirements of the listed CAGE codes and reference numbers (62650 and 81220, ref. 1106-4X3IPS-STL150LB FLGE)
- Meet a repair turnaround time (RTAT) of 354 days, measured from receipt of the asset at your facility to Government acceptance
- Quote unit price, total price, and your RTAT (explain capacity limits if you cannot meet 354 days)
- Report asset transactions in the Commercial Asset Visibility (CAV) system within 5 business days of receipt
- Give a testing and evaluation price if the asset is beyond repair, and compare the repair price to the price of a new unit
- Mark items per MIL-STD-130 and package per MIL-STD 2073
- Keep inspection records for 365 days after final delivery
- Contract type
- Repair solicitation (RFQ); bilateral award, with the quote marked firm-fixed-price, estimated, or not-to-exceed
- Period of performance
- Repair turnaround time of 354 days per asset; the Government intends to add an option quantity, exercisable within 365 days after award
- Offers due
- 2026-10-26 4:30 PM Eastern (2026-10-26T16:30:00-04:00)
What to include when you submit
- Verify nomenclature, part number and NSN (National Stock Number) before responding
- Fill in unit price, total price and RTAT in days
- If not quoting 354 days or less, describe your capacity constraints
- Check one: Firm-Fixed-Price, Estimated, or Not-to-Exceed
- Give your testing and evaluation fee if the asset is beyond repair
- Provide awardee CAGE, inspection and acceptance CAGE, and facility or subcontractor CAGE where assets should be shipped
- Give the new unit price and new unit delivery lead time so the Government can compare repair to buying new
- State your price reduction amount per unit per month late, and the maximum
- Contact: ALISON.E.HARPER.CIV@US.NAVY.MIL, 771-229-0456
You must have
- CMMC (Cybersecurity Maturity Model Certification) level requirements apply; the level is not given in the text
NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))
- Government Source Inspection is required
Government Source Inspection (GSI) is required.
- Buy American / Free Trade Agreements certificate must be completed
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))
- Annual representations and certifications must be completed (these should be current in your SAM.gov registration)
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))
- Repair must follow your own repair standards, manuals and approved technical procedures, which implies you need repair capability and a quality system
All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives
Not in the notice text
- Quantity of valves to be repaired
- Estimated value
- How the award will be decided
- How and where to submit the quote
- Which CMMC level applies
- Whether a small business subcontracting plan applies to small businesses (the clause is listed)
- Delivery or return location
Is this a fit for your business?
Create a free accountFedReady checks notices like this against your business profile, tracks deadlines, and alerts you to new matches. Creating an account is free.
Key facts
- Response due
- Oct 26, 2026, 8:30 PM UTC
- Posted
- Sep 25, 2026
- Notice type
- Solicitation
- Solicitation
- N0010426QTC43
- Agency
- Dept of Defense · Dept of the Navy
- Office
- NAVSUP Weapon Systems Support Mech
- NAICS
- 332919
- Product/service code
- 4820
- Business type
- Manufactured parts & equipment
- Contracting contact
- Telephone: 7712290456ALISON.E.HARPER.CIV@US.NAVY.MIL
Full notice text from SAM.gov
CONTACT INFORMATION|4|N771.4|WG7|771-229-0456|ALISON.E.HARPER.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|COMBO INVOICE AND RECEIVING||TBD|N00104|TBD|TBD|SEE SCHEDULE|SEE SCHEDULE|SEE SCHEDULE||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS MECHANICSBURG| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|ALISON HARPER AT ALISON.E.HARPER.CIV@US.NAVY.MIL| EXERCISE OF OPTION TO FULFILL FOREIGN MILITARY SALES COMMITMENTS-BASIC(NOV 2014))|4||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1|| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(JUL 2026))|2||| OPTION FOR INCREASED QUANTITY (MAR 1989)|1|365 days after execution of award| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEV 2026-O0015)(JUL 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|X|X|X|||X|X||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| This solicitation is issued pursuant to Emergency Acquisition Flexibilities (EAF). Accelerated and incremental delivery is encouraged and accepted before the delivery date(s) listed in the schedule. All freight is FOB Origin. This RFQ is for repair. The resultant award of this solicitation will be issuedbilaterally, requiring the contractors written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding. The Government is seeking a Repair Turnaround Time (RTAT) of: 354 Days Government Source Inspection (GSI) is required. Please note freight is handled by the Navy as per the Commercial Asset Visibility (CAV) Statement of Work. Your quote should include the following information: QUOTE AMOUNT AND RTAT Unit Price:__________ Total Price:__________ Repair Turnaround Time (RTAT): _______ days If your company is not quoting the Government's Required Repair Turnaround Time (RTAT) or earlier, provide your company's capacity constraints? _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractors facility as reflected in the Acction Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE) ___ TESTING AND EVALUATION IF BEYOND REPAIR T&E fee/price (if asset is determined BR/BER): AWARDEE INFO & PERFORMANCE LOCATION Awardee CAGE: __________ Inspection & Acceptance CAGE, if not same as "awardee CAGE": __________ Facility/Subcontractor CAGE (where the asset should be shipped), if not same as "awardee CAGE":__________ IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW New unit price:__________ New unit delivery lead-time:__________ The Government intends to add an option quantity to the resultant contract. Inreference to the option quantity, the Government may increase the quantity of supplies called for in the Schedule at the unit price specified. The Contracting Officer may exercise the option by written notice to the Contractor within the number of days in 52.217-7 herein. Delivery of the added items shall continue at the same rate as the like items called for under the contract, unless the parties otherwise agree. IMPORTANT NOTE: Any asset for which the contractor does not meet the required RTAT will incur a price reduction per unit/per month the contractor is late - any delay determined to be excusable (e.g. Government Delay) will not result in a price reduction. If a price reduction is required due to unexcusable contractor delay, the Contracting Officer will implement the price reduction via a "reconciliation modification" at the end of the contract performance. Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's right to terminate for default. In reference to the above important note, the contractor provides the following price reduction amount per unit per month the contractor does not meet the RTAT: $__________, up to a maximum of: $_________. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the VALVE,COMBINATION . 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The VALVE,COMBINATION repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures. CAGE___Ref. No. ;62650 1106-4X3IPS-STL150LB FLGE 81220 1106-4X3IPS-STL150LB FLGE; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV K, 15 JAN 2000; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 4. QUALITY ASSURANCE 4.1 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.2 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE