CFA-686 Carbon-based Fuels Capability CO2 Compressor Design/Build
Department of Energy · Sol. INL-26-055
Due in 10 days
AI summary Beta
Battelle Energy Alliance, which runs Idaho National Laboratory for the Department of Energy, is asking for expressions of interest from firms that can design, build, test and deliver a CO2 compressor in a shipping container. This is a Sources Sought step; selected firms may later get an RFP for a firm-fixed-price design/build contract. Work is for the Central Facilities Area in Idaho Falls, ID.
Watch out for
- Long fabrication schedule. The plan allows 40 weeks for shop fabrication alone, which is hard on cash flow for a small shop.
complete shop fabrication (40 weeks)
- Custom engineered equipment with tight space limits. Everything must fit a fixed container size and meet several codes, so design risk sits with the contractor.
The compressor and all components must fit within a high cube shipping container
- Heavy testing and QA requirements. Non-destructive examination, operational testing and a 10-hour reliability test are expected.
a 10-hour continuous reliability test
- Not a direct bid. Only firms BEA judges potentially qualified will get the RFP, so a response is only a first step.
Only potentially qualified offerors, as determined by BEA, will receive the RFP for the project.
Read from the notice text only.
Full brief
What they want
- Design, fabricate, test and deliver an oil-free, liquid-cooled, fixed-speed, electric motor driven CO2 compressor
- Meet outlet conditions of 1,400 psig, 66.1 scfm and 150F
- Fit the compressor and all parts inside a high cube shipping container on a structural frame built to AISC and AWS D1.1
- Build any pressure vessels to ASME Section VIII, Division 1 and register them with the National Board
- Include a UL-508A control panel with alarms, data logging and an emergency shutoff
- Provide inspection and testing, including a 10-hour continuous reliability test
- Provide O&M documentation, a recommended spare parts list and startup and commissioning field support
- Contract type
- Firm-fixed price (planned design/build contract; this notice is an expression of interest)
- Period of performance
- After receipt of order: engineering documentation report 3 weeks, shop fabrication drawings 4 weeks, shop fabrication 40 weeks, compressor arrival at INL 3 weeks
- Place of performance
- Idaho Falls, ID, USA (INL Central Facilities Area)
- How they'll choose
- Not stated for the EOI; any later RFP would use a source selection process with ranking of technical and price proposals
- Offers due
- 2026-10-16, close of business (response deadline 2026-10-16T23:59:00-06:00)
- How to submit
- Email to Chase Egbert (chase.egbert@inl.gov)
- Page limits
- Responses must be no more than 5 pages
What they'll judge offers on
- Qualifications addressing the seven listed criteria (experience with oil-free CO2 or industrial gas compressors, ASME/AISC/AWS experience, schedule capability, container packaging, testing plan, quality assurance plan, O&M and startup support)
What to include when you submit
- Show qualifications addressing each listed criterion
- Technical questions must be submitted in writing by email to Ben Bryson (Benjamin.Bryson@inl.gov) or Chris Dudley (Christopher.Dudley@inl.gov)
- Selection decision is expected in November 2026
You must have
- Experience designing and building oil-free, liquid-cooled CO2 or industrial gas compressor packages
Experience in design and fabrication of oil-free, liquid-cooled CO2 or industrial gas compressor packages.
- ASME Section VIII, Division 1 pressure vessel experience, plus structural fabrication to AISC and AWS D1.1
Experience with ASME Section VIII, Division 1 pressure vessel design where applicable to compressor components
- Agree to keep a written Quality Assurance Plan based on a national consensus code such as ANSI/ASME ISO-9000
Agreement to maintain a written Quality Assurance Plan based on a national consensus code such as ANSI/ASME ISO-9000.
- Pressure vessels must be stamped and registered with the National Board
stamped and registered with the National Board
Not in the notice text
- Fabrication drawings, nozzle locations and design details come only with the RFP
- Estimated value or budget
- NAICS code and PSC are blank
- Whether a small business set-aside applies (listed as none)
- RFP release date and award timeline beyond a November 2026 selection decision
Is this a fit for your business?
Create a free accountFedReady checks notices like this against your business profile, tracks deadlines, and alerts you to new matches. Creating an account is free.
Key facts
- Response due
- Oct 17, 2026, 5:59 AM UTC
- Posted
- Sep 21, 2026
- Notice type
- Sources Sought
- Solicitation
- INL-26-055
- Agency
- Department of Energy
- Office
- Battelle Energy Alliance–doe CNTR
- Place of performance
- Idaho Falls, ID, 83415
- Contracting contact
- Chase Egbertchase.egbert@inl.gov
- Versions
- 2 (amended since first posted)
Full notice text from SAM.gov
INTRODUCTION Battelle Energy Alliance, LLC (BEA), Management & Operating Contractor of the U.S. Department of Energy (DOE) owned Idaho National Laboratory (INL), is seeking an Expression of Interest (EOI) from prospective offerors to support the design, fabrication, testing, and delivery of a CO2 compressor for the Central Facilities Area (CFA) Carbon-based Fuels Capability. PROCESS BEA is seeking qualified firms to compete for the design/build contract in support of the CFA-686 CO2 Compressor. As determined by BEA, responders to this EOI may receive a Request for Proposal (RFP) that will require detailed technical and price proposals be provided for evaluation and ranking under a source selection process. Interested firms are advised that RFP release and the source selection/award decision timeline will be communicated following review of submitted EOIs. The contract award type will be firm-fixed price. Per the proposed project schedule, all durations are After Receipt of Order (ARO): Engineering Documentation Report (3 weeks), shop fabrication drawings (4 weeks), complete shop fabrication (40 weeks), and compressor arrival at INL (3 weeks). PROJECT DESCRIPTION The compressor will be designed, fabricated, tested, and delivered for the INL Central Facilities Area (CFA) Carbon-based Fuels Capability (CFA-686). The compressor will be used to compress CO2 from a combustor unit into a storage vessel that will supply gas to downstream users, and will be housed in a protected shipping container. The compressor shall be oil-free, liquid-cooled, fixed speed, and electric motor driven. Inlet conditions are 50-100°F at 0.14-2 psig; outlet conditions are 1,400 psig, 66.1 scfm, and 150°F, with the unit operating on a nearly continuous basis. The compressor and all components must fit within a high cube shipping container with interior dimensions of 19'6" long x 7'9" wide x 8'10" high, and must be mounted on a structural frame designed and fabricated in accordance with the American Institute of Steel Construction (AISC), with welding per AWS D1.1. Any pressure vessels used in fabrication of the compressor must be designed and fabricated in accordance with ASME Section VIII, Division 1, and stamped and registered with the National Board. The compressor must withstand a CO2 gas stream composition of approximately 99% CO2 with trace nitrogen, oxygen, water vapor, carbon monoxide, nitrogen oxides, sulfur oxides, hydrocarbons, hydrogen sulfide, and hydrogen chloride. The unit will be installed at INL at an altitude of approximately 4,938 ft, with a shipping container temperature range of 41°F to 104°F and humidity from 0 to 100%. The compressor package must include a control panel with instrumentation and alarms for conditions such as low discharge pressure and motor failure, a data history logging function, an emergency shutoff switch, and UL-508A listed control panels. The unit must be provided with inter-coolers or after-coolers to maintain outlet temperature at or below 150°F, and a stainless steel drip pan sized to contain at least 1.5 times the volume of any fluids contained in the compressor. Specific fabrication drawings, nozzle location diagrams, and design details will be provided to qualified offerors as part of the RFP process. PROCESS This EOI is the first step in identifying interested and qualified vendors for future solicitation. Responses may be used to inform the development of a formal solicitation list. Selected vendors may be invited to participate in a Request for Proposal (RFP) process for award consideration. SUBMITTAL REQUIREMENTS Interested firms are requested to provide expressions of interest to Chase Egbert (chase.egbert@inl.gov) by close-of-business on 10/16/2026. Included must be sufficient written information confirming the responder's qualifications addressing each of the following criteria: Experience in design and fabrication of oil-free, liquid-cooled CO2 or industrial gas compressor packages. Experience with ASME Section VIII, Division 1 pressure vessel design where applicable to compressor components, and structural fabrication in accordance with AISC and AWS D1.1. Capability to meet the design/build schedule outlined above. Capability to package the compressor, motor, controls, and all interconnecting piping and instrumentation within the required shipping container footprint. Proper identification and execution plan for inspection, examination, and testing, including non-destructive examination of castings and welds, operational testing, and a 10-hour continuous reliability test. Agreement to maintain a written Quality Assurance Plan based on a national consensus code such as ANSI/ASME ISO-9000. Capability to provide Operations & Maintenance documentation, a Recommended Spare Parts List, and field support for startup and commissioning. Note that responses must be no more than 5 pages in length. Only potentially qualified offerors, as determined by BEA, will receive the RFP for the project. Interested individuals are advised that the selection decision is anticipated in November 2026. If you have questions, need additional information, or need to speak with a BEA Point of Contact, please contact the following via email: Project Manager - Ben Bryson - Benjamin.Bryson@inl.gov Project Engineer - Chris Dudley - Christopher.Dudley@inl.gov Technical questions must be submitted in writing via email.