Solicitation
SCREW,CAP,SOCKET HE
Dept of Defense · Dept of the Navy · Sol. N0010426QYAJG
Due in 16 days
AI summary Beta
Some details are in the notice's attachments, which this summary didn't read. Check the attachments on SAM.gov.
NAVSUP Weapon Systems Support (Mechanicsburg) wants 460 socket head cap screws (flat head, Type IV, nickel-copper) for use on Navy submarines, built to drawing 4491143. The Navy set the buy aside 100 percent for small businesses and delivery is FOB destination. The notice does not give a delivery date.
Watch out for
- Conflicting evaluation language. One part says best value (price plus non-price factors) and another says lowest aggregated total price, so ask the contracting officer how award will really be decided.
WILL BE BASED UPON THE LOWEST AGGREGATED TOTAL PRICE SUBMITTED FOR THE TOTAL QUANTITY, INCLUSIVE OF THE OPTION PROVISON.
- Heavy submarine quality and documentation requirements. You need an approved quality plan, 100% inspection with recorded measurements, heat-lot traceability and several certificates, which takes a real quality system.
Government approval of the production lot testing/inspection report is required prior to shipment of production lot units.
- Mercury contamination is cause for rejection. You must keep mercury out of manufacturing and testing and certify it.
Mercury contamination of the material will be cause for rejection.
- Option for added quantity. The Government can add quantity within 180 days of award at the quoted price, so price the option carefully.
- Warranty. A warranty clause is listed, with one year after delivery for the warranty period and 45 days after discovery of a defect.
Read from the notice text only.
Full brief
What they want
- Make and supply 460 Screw, Socket Flat Head, Type IV, to Drawing 4491143, Piece Number 65 (NSN 5305-01-087-7551 as written in the notice)
- Use the self-locking element (Nylok) per NASM 15981
- Mark each production lot with material symbol NICU, manufacturer's symbol and lot number, and tag or bag with drawing, contract and heat number
- Keep the parts mercury free and provide a mercury exclusion certification
- Inspect 100% of units (visual, dimensional and threads) and record measurements
- Submit a quality inspection and test plan and a production lot test report for Government approval
- Provide mill certificate and certificate of compliance for each lot
- Price the 180-day option for increased quantity
- Contract type
- Fixed-price supply order from a Request for Quotation, with an option for increased quantity
- Period of performance
- Not stated; the option for added quantity can be used within 180 days after award
- How they'll choose
- Best value considering price and non-price factors (the notice also says award is based on lowest aggregated total price including the option; see red flags)
- Offers due
- 2026-10-23 4:30 PM Eastern (16:30 -04:00)
- How to submit
- Quotation (RFQ); the notice does not name an email or portal for submission. A contact email is TAYLOR.M.WEIDMAN2.CIV@US.NAVY.MIL
What they'll judge offers on
- Price
- Delivery lead time
- Past performance
What to include when you submit
- Include pricing on the option provision for added quantity
- Propose a delivery lead time and schedule
- Show past performance on related contracts
- If you have prior authorization to use a later drawing revision for the same NSN, tell the contracting officer in your response
- Invoice through Wide Area Workflow (combo invoice and receiving report)
You must have
- Small business (100 percent small business set-aside)
This requirement is 100 Percent set-aside for small businesses.
- Quality inspection system to MIL-I-45208 or ISO 9001, and NCSL Z540.3 or ISO 10012
The Supplier's Quality Inspection System shall be in accordance with MIL-I-45208 or ISO 9001 and NCSL Z540.3 or ISO 10012.
- Buy American and Balance of Payments Program certificates are part of the clauses listed
BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)
Not in the notice text
- Delivery date or schedule
- Delivery address (FOB destination is stated)
- Exact way to submit the quotation
- Which CMMC level applies, if any (no CMMC notice appears in this text)
- Option quantity percentage
- Drawing 4491143 and referenced specifications are not included in the text
Is this a fit for your business?
Create a free accountFedReady checks notices like this against your business profile, tracks deadlines, and alerts you to new matches. Creating an account is free.
Key facts
- Response due
- Oct 23, 2026, 8:30 PM UTC
- Posted
- Sep 29, 2026
- Notice type
- Solicitation
- Solicitation
- N0010426QYAJG
- Agency
- Dept of Defense · Dept of the Navy
- Office
- NAVSUP Weapon Systems Support Mech
- NAICS
- 332722
- Product/service code
- 5305
- Business type
- Manufactured parts & equipment
- Contracting contact
- Electronic Mail: TAYLOR.M.WEIDMAN2.CIV@US.NAVY.MILTAYLOR.M.WEIDMAN2.CIV@US.NAVY.MIL
- Versions
- 4 (amended since first posted)
Full notice text from SAM.gov
CONTACT INFORMATION|4|N741.P15|ER4|N/A|TAYLOR.M.WEIDMAN2.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|6|X|||||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORTS (COMBO)||N/A|ER4|N/A|N/A|N/A|N/A|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS MECHANICSBURG| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|1 YEAR AFTER DATE OF DELIVERY|45 DAYS AFTER DISCOVERY OF DEFECT||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(JUL 2026))|2||| OPTION FOR INCREASED QUANTITY (MAR 1989)|1|180 DAYS| LIMITATIONS ON PASS-THROUGH CHARGES (DEV 2026-O0048)(MAR 2026)|1|| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEV 2026-O0037)(FEB 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| This procurement requirement is for quantity 460 SCREW,CAP,HEXAGON H (NSN 1HM 5305 010877551 SQ). This requirement is 100 Percent set-aside for small businesses. The Government will issue an award resulting from this Request for Quotation (RFQ) to the responsible offeror whose quotation, conforming to the solicitation, results in the best value to the Government, considering both price and non-price factors. The following factors will be used to evaluate competitive offers received in response to this RFQ: 1. PRICE 2. NON-PRICE FACTORS 1. Delivery Lead Time. The proposed delivery lead times and schedules will be evaluated and the proposed delivery lead time considered to be in the best interest of the Government will be rated higher than other delivery lead times proposed. 2. Past Performance. The offeror?s past performance on related contracts will be evaluated to determine, as appropriate, successful performance of contract requirements, quality and timeliness of delivery of goods and services, cost management, communications between contracting parties, proactive management, and customer satisfaction. All non-price evaluation factors, when combined, are approximately equal to price. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. \ 1. SCOPE 1.1 ;This procurement specification contains the requirements for manufacture and the contract quality requirements for ;Screw, Socket Flat Head; for use on Navy submarines.; 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.1.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.1.3 The "Document Changes" section provides supersessions/changes to referenced documents. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. DRAWING DATA=4491143 |53711| P| |D| | | | DOCUMENT REF DATA=FF-S-86H | | | |210607|A| | | DOCUMENT REF DATA=MIL-STD-973 | | | |950113|A| |03| DOCUMENT REF DATA=MIL-STD-130N | | | |121116|A| |01| DOCUMENT REF DATA=QQ-N-281D | | | |851023|A|2 | | DOCUMENT REF DATA=ISO 9001 | | | |150915|A| | | DOCUMENT REF DATA=ISO 10012 | | | |030415|A| | | DOCUMENT REF DATA=NASM15981 | | |2 |140919|A| | | DOCUMENT REF DATA=NCSL Z540.3 | | | |060803|A| | | DOCUMENT REF DATA=FED-STD-H28/20B | | | |941221|A| |01| DOCUMENT REF DATA=MIL-I-45208A | | | |810724|A|1 | | DOCUMENT REF DATA=EIA-649C 2/19 | | | | |A| | | DOCUMENT CHANGE DATA=MS15981 |NASM 15981 3. REQUIREMENTS 3.1 ;Design and Manufacturing - The ;Screw, Socket Flat Head, Type IV; furnished under this contract/purchase order shall meet the material, physical and mechanical requirements as specified on Drawing 4491143, Piece Number 65 including associated specifications mentioned in this procurement.; 3.1.1 ;The Self-Locking Element (Nylok) furnished under this order shall be in accordance with NASM 15981 as specified on drawing 4491143.; 3.2 ;Marking Requirements - The supplier shall permanently mark and identify each production lot unit ;Screw, Socket Flat Head; on the top surface with material symbol "NICU", manufacture's symbol and lot number per MIL-STD-130 and shall ;tag or bag; with drawing/piece, contract and heat number.; 3.3 ;Notification - The supplier shall notify Naval Surface Warfare Center, Philadelphia Division, (NSWCPD), 5001 S. Broad Street, Philadelphia, PA 19112-1403 by email matthew.j.ogilvie.civ@us.navy.mil, Code 242MO after award of contract.; 3.3.1 ;The NSWCPD is the acceptance activity for the Contract Data Requirements List (DD1423) Data Items. NSWCPD WAWF/IRAPT ;Acceptor; DODACC is ;N64498;.; 3.4 Configuration Control - MIL-STD-973 entitled "Configuration Management", Paragraph 5.4.8, Configuration Control (Short Form Procedure), is hereby incorporated. The Contractor shall submit all Engineering Change Proposals in accordance with MIL-STD-973, Paragraph 5.4.8.2 and Appendix D. Requests for Deviations shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.3 and Appendix E. Requests for Waivers shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.4 and Appendix E. (Original and two copies shall be submitted to Contracting Officer, NAVICP-MECH, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.) 3.4.1 Configuration Control - When the Contractor has received authorization on a prior contract for the same NSN for the use of a drawing of a later revision status, that authorization is hereby extended to all succeeding contracts/purchase orders until another drawing revision is approved. The Contractor will notify the PCO of this occurrence in each instance, in the response to the solicitation. Such notification shall be in writing setting forth the contract under which the prior authorization was granted, the date of the granting of the authorization, and the name of the granting authority. Contractors shall also refer technical inquiries (other than those covered by MIL-STD-973) on company letterhead signed by a responsible company official, with copies distributed as stated below. The original and two copies of all Contractor generated correspondence regarding configuration shall be submitted to Contracting Officer, NAVICP-MECH, P.O. Box 2020, Mechanicsburg, PA 17055-0788. Contractors are cautioned that implementing engineering changes, waivers, deviations or technical inquiries into the contract/purchase order without approval of the Contracting Officer will be at the sole risk of the Contractor. 3.5 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material will be cause for rejection. If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a "Warning Plate" stating that metallic mercury is a functional part of the item and will include name and location of that part. The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are located so as not to constitute a contamination hazard. If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a polyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the requirements of this contract are concerned. These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements. Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided: Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a component could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface ship atmosphere. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 4.4 ;Inspection System - The Supplier's Quality Inspection System shall be in accordance with MIL-I-45208 or ISO 9001 and NCSL Z540.3 or ISO 10012. The supplier'shall develop and submit their written Quality Inspection and Test Plan as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the supplier?s written Quality Inspection and Test Plan is required by the contract. CDRL: QUALITY INSPECTION & TEST PLAN per MIL-I-45208, NCSL Z540.3 and DI-QCIC-81110 ; 4.5 ;Finished Edges - Finished edges shall be in accordance with the applicable drawing requirements.; 4.6 ;Threads - Threads shall be inspected in accordance with ASME B1.3 System 22 requirements as required by FF-S-86. Thread inspection shall include the measurement and recording of the major diameter for external threads and the minor diameter for internal threads.; 4.7 ;Material Control - The supplier shall have an effective material control system that provides for certified quantitative mill or industrial laboratory reports of chemical and physical analysis by heat, lot or batch for raw material ordered for production units. If the material is subsequently heat- treated a certification of physical analysis, after heat treatment is also required for each heat lot or batch. Also, where the applicable material specification calls out (e.g., corrosion resistance test, macro-etch test) these test results shall also be reported on the applicable mill or industrial laboratory report. The physical analysis shall establish the following properties for metallic part: Mechanical Properties (Ultimate Tensile Strength, Yield Strength and Elongation). ; 4.8 ;Production Lot. ; 4.8.1 ;Visual/Dimensional Inspection - The supplier shall visually and physically inspect 100% the production lot units and record the actual measurements of each dimension and feature including threads (also the major diameter for external threads) identified on the applicable drawing. Threads shall be inspected 100% and results recorded. ; 4.9 ;Production Lot Testing/Inspection Report and Acceptance - (Supplier Testing/Inspection). The supplier shall submit for the completed production units ;Screw, Socket Flat Head; testing/inspection reports in compliance with the applicable Data Item Descriptions (DIDs), drawing and specifications. . The Production Lot Testing/Inspection report shall consist of ;Certified Mill Certification; Certificate of Compliance; Visual/Dimensional Inspection Report and Mercury Exclusion Certification; identified in the Objective Quality Evid ence Records Section of this document, and as indicated on the Production Lot Test/ Inspection (PLT) Contract Data Requirements List (DD Form 1423). Government approval of the production lot testing/inspection report is required prior to shipment of production lot units. CDRL: PRODUCTION LOT TESTING/INSPECTION REPORT per DI-NDTI-80809B; 4.10 ;Production Lot Inspection/Acceptance - (Supplier Testing/Inspection). The supplier shall submit for the production lot units, the inspection and test reports identified in the Objective Quality Evidence Records Section of this document and as indicated on the Production Lot Testing/Inspection (PLT) Contract Data Requirements List (DD Form 1423). Government approval is required prior to shipment of production units. ; 4.11 ;Final Inspection and Acceptance - Final inspection and acceptance of production lots shall be made by the cognizant DCMA-QAR in conjunction with the Specific Government Inspection Instructions (SGIIs) furnished by NSWCPD. In addition to the normal DCMA surveillance, the production unit(s) shall be under the surveillance of NSWCPD Quality Assurance Specialist as required.; 4.12 ;Objective Quality Evidence Records - The supplier shall maintain Objective Quality Evidence Data (OQEDs) of raw material and finished parts. Records shall be traceable by drawing/piece, heat, lot and contract number. All OQEDS shall be clearly legible including name and title. The supplier may provide exact (quality) photocopies of objective quality evidence records being delivered under this purchase order instead of originals.; 4.12.1 ;The supplier shall furnish a copy of the following OQEDs listed below and as indicated on the Contract Data Requirements List (DD Form 1423) for acceptance. The reports shall be correlated to the drawing/piece, heat, lot and contract number. Supplier format is acceptable for the below listed CDRLs. a.Certified Quantitative Mill or Industrial Laboratory Certification (chemical and physical analysis) in accordance with drawing and FF-S-86 requirements. CDRL: CERTIFIED MILL CERTIFICATE per DI-MISC-82386 b.Certificate of Compliance(certifying Self-Locking Element in accordance with the drawing 4491143 and NASM 15981 requirements). CDRL: CERTIFICATE OF COMPLIANCE per DI-MISC-82386 c.Visual/Dimensional Inspection Reports shall show all the characteristics, the actual measurement results of each dimension and feature inspected including threads (also the major diameter for external threads), contract number, name of supplier, drawing/piece number, drawing revision heat and lot number, material symbol "NICU" and manufacture's symbol of finished parts, item nomenclature, inspector's acceptance signature and date. CDRL: VISUAL/DIMENSIONAL INSPECTION REPORT per DI-NDTI-80809B d.Mercury Exclusion Certification (representing the contract units shipment) CDRL: MERCURY EXCLUSION CERTIFICATION per DI-MISC-80678; 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. A. Availability of Cancelled Documents - The DODSSP offers cancelled documents that are required by private industry in fulfillment of contractual obligations in paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. They may be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government Contract Number, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVICP-MECH Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered from: Commanding Officer NAVICP-MECH Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Naval Inventory Control Point Code 1 Support Branch 700 Robbins Avenue Phildelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications shall be obtained by submitting a request on DD Form 1425 to NAVICP-MECH. IAW MIL-STD-1222J, para 6.3 relief from full compliance of ND-DNDTI-80809B is approved and only the following actions are required: 10.1, 10.2.1, 10.2.3.2, 10.2.6.4.2.a, 10.2.6.5.b, 10.2.7.1, and 10.2.7.3. THE OPTION PROVISION IS INCLUDED IN THE EVENT THE GOVERNMENT HAS AN ADDITIONAL REQUIREMENT 180 DAYS AFTER ISSUANCE OF THE AWARD. THIS WILL AUTHORIZE THE GOVERNMENT TO ADD THE ADDITIONAL QUANTITY, UP TO THE PERCENTAGE CITED, TO THE ORDER, VIA MODIFICATION WITHOUT HAVING TO RE-SOLICIT. IT IS REQUESTED THAT PRICING BE SUBMITTED ON THE OPTION PROVISION. EVALUATION FOR THE AWARD OF THE PROPOSED REQUIREMENT WILL BE BASED UPON THE LOWEST AGGREGATED TOTAL PRICE SUBMITTED FOR THE TOTAL QUANTITY, INCLUSIVE OF THE OPTION PROVISON. \ DATE OF FIRST SUBMISSION=ASREQ ;;APPROVAL OF THE QUALITY INSPECTION PLAN BY NSWC PHILADELPHIADIVISION IS REQUIRED PRIOR TO PRODUCTION .; ;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A001.NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".;; DATE OF FIRST SUBMISSION=ASREQ ;;SUPPLIER FORMAT IS ACCEPTABLE.; ;PLT REPORT SHALL CONSIST OF THE OQED RECORDS LISTED IN CONTRACTSECTION E: CERTIFIED MILL CERTIFICATION; CERTIFICATE OF COMPLIANCE;VISUAL/DIMENSIONAL INSPECTION REPORT AND MERCURY EXCLUSIONCERTIFICATION.; ;APPROVAL OF THE REPORT BY NSWC PHILADELPHIA DIVISION ISREQUIRED PRIOR TO SHIPMENT OF PRODUCTION LOT UNITS.; ;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A002.NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".; ;
Similar open opportunities
- COMPRESSOR,REFRIGER, IN REPAIR/MODIFICATION OFNAVSUP Weapon Systems Support (Mechanicsburg) posted a presolicitation for repair of 13 refrigeration compressors (NSN 7H-4130-015136359), delivered FOB Origin.
- AMMONIUM HYDROXIDE,NAVSUP Weapon Systems Support (Navy) plans to buy 2,739 PG of Ammonium Hydroxide (NSN 1HM 6810-01-018-9769 X2) made to a technical data package.
- 41- Vaneaxial Fans
- Sources Sought - Directional Hemispherical Reflectometer
- BEARING, BALL, DX