Combined Synopsis/Solicitation
Thermal Arc Sound Attenuation Booth
Dept of Defense · Dept of the Army · Sol. W911S227U0010
Due in 6 daysSmall business
AI summary Beta
This summary was written for another version of this notice. Check what changed on SAM.gov.
The Army (McAlester Army Ammunition Plant engineering, through MICC Fort Drum) wants to buy two thermal arc sound attenuation booths, one of each of two sizes, delivered assembled in two halves. The notice is set aside for small businesses. The Army will check each vendor's technical description before awarding.
Watch out for
- Technical approval before award. Army engineers must approve your equipment concept before any award, so your offer needs detailed technical paperwork.
The MCAAP Engineering Support Division will validate and verify/approve the contractor listed equipment concept before award is granted.
- Detailed drawings required with the offer. You must submit a detailed description and drawings up front, which takes engineering time before you know if you will win.
the offeror shall submit with their proposal a detailed technical description of the thermal arc booth.
- Specification looks brand-driven and has inconsistent model numbers. Models are listed as Qualitech 'or similar' and the model numbers do not appear to match the stated sizes, so confirm what is required with the contracting office.
Item/Model #: QT100118128TA or similar.
- Short deadline. The notice was posted October 2 with offers due October 13, leaving little time to prepare drawings.
Read from the notice text only.
Full brief
What they want
- One thermal arc booth, about 77.5 x 102.5 x 116 inches (Item/Model QT100118128TA or similar), with door hardware and switches
- One thermal arc booth, about 100 x 118.5 x 128 inches (Qualitech model QT77102116TA or similar), doors shipped loose
- 18-gauge galvanized panels, single-slope roof, Rockwool insulation and a galvanized perforated interior liner
- Internal plenum, welding arm offset and cut out, mounting plates, anchoring hardware and internal bracing
- Detailed technical description and approval drawings with the proposal
- 3D models after award
- How they'll choose
- Engineering verification of the vendor's proposal before award; the notice does not name price or other factors
- Offers due
- 2026-10-13 12:00 PM Central (-05:00)
What they'll judge offers on
- Technical description accounting for every required product feature
What to include when you submit
- Include a detailed technical description of the thermal arc booth that covers every required feature
- Include approval drawings; conceptual drawings alone are not enough and as-built style drawings are required
- Provide 3D models in native SolidWorks, IGES and/or STEP format within two weeks after award
You must have
- Small business set-aside (NAICS 332322, Sheet Metal Work Manufacturing)
Not in the notice text
- How the award will be decided, including how price is weighed
- How to submit the offer
- Delivery location and delivery date
- Contract type
- Estimated value
- Whether a purchase order or other award form will be used
Is this a fit for your business?
Create a free accountFedReady checks notices like this against your business profile, tracks deadlines, and alerts you to new matches. Creating an account is free.
Key facts
- Response due
- Oct 13, 2026, 5:00 PM UTC
- Posted
- Oct 5, 2026
- Notice type
- Combined Synopsis/Solicitation
- Solicitation
- W911S227U0010
- Agency
- Dept of Defense · Dept of the Army
- Office
- W6QM MICC-FT Drum
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 332322
- Product/service code
- 5410
- Business type
- Manufactured parts & equipment
- Place of performance
- 74501
- Contracting contact
- Eric Marklanderic.w.markland.civ@army.mil15206872958
- Versions
- 2 (amended since first posted)
Full notice text from SAM.gov
Amendment 0001 CLIN Correction. Thermal Arc Booth Salient Characteristics MCAAP Engineering will verify and validate the proposal from the vendor prior to award.Scope: Thermal Arc Sound Attenuation Booth. Includes all necessary parts and hardware for a completely erected (in 2 halves) Thermal Arc Booth.Item/Model #: QT100118128TA or similar. 1 EAProduct Description:77.5-inch x 102.5-inch x 116-inch Booth.Includes all necessary parts and hardware for a completely erected (in 2 halves) Thermal Arc Booth.18ga galvanized flat panel construction with single slope style roof. Rockwool insulation enclosed in between the 3-inch-deep exterior wall panel and the galvanized, perforated interior liner. Unit is to be assembled and shipped with doors loose. Door hardware and switches included.All onsite installation, mounting, etc. are by others. All auxiliary components (exhaust fan, lights, switches, etc.) are supplied and installed by others.Model: Qualitech thermal arc sound attenuation booth model QT77102116TA or similar. 1 EA.Product Description:100-inch x 118.5-inch x 128-inch Booth.Includes all necessary parts and hardware for a completely erected (in 2 halves) Thermal Arc Booth.18ga galvanized flat panel construction with single slope style roof. Rockwool insulation enclosed in between the 3-inch-deep exterior wall panel and the galvanized, perforated interior liner. Unit is to be assembled and shipped with doors loose. All onsite installation, mounting, etc. are by others. All auxiliary components (exhaust fan, lights, switches, etc.) are supplied and installed by others.Thermal Arc Booth Dimensional specs:102.5-inch overall outer dimension entrance to exit face.86.5-inch overall outer dimension of booth depth.36.5-inch outer dimension of front booth section depth.20-inch outer dimension of back booth section depth including the welding arm offset.44-inch outer dimension wide by 9-inch outer dimension deep welding arm offset centered on the back booth section with a 114-inch tall and 26-inches wide cut out.30-inch door gap between the front and back booth sections.10-inch gap on the top between the front and back booth sections for monorail fed items.120-inch minimum interior height.3-inch-deep exterior wall panels.18-inch x 18-inch hole for duct transition piece located on the front booth section above the internal plenum.Features: Internally mounted entrance door that swings towards the front.Externally mounted exit door that swings towards the front.Door hardware and switches including cylinders and controls.Internal plenum in the front booth section for ventilation.Welding arms offset and cut out.18ga galvanized flat panel construction with single slope style roof.Rockwool insulation.Galvanized perforated interior liner. Mounting plates for floor anchoring.Anchoring hardware. Internal bracing.MCAAP to provide: Building air. Installation. Auxiliary components.DETAILED DESCRIPTION REQUIRED PRIOR TO AWARD: The MCAAP Engineering Support Division will validate and verify/approve the contractor listed equipment concept before award is granted. In order to meet this review requirement, the offeror shall submit with their proposal a detailed technical description of the thermal arc booth. The offerors description submittal shall account for each one of the required product features located in this qualifying statement. Conceptual drawings that are not detail as built drawings are required for submittal with the detailed description.Approval drawing(s) is/are requested. 3D models requested can be in native SolidWorks format, IGES, and/or STEP within two weeks after award.
Similar open opportunities
- COMPRESSOR,REFRIGER, IN REPAIR/MODIFICATION OFNAVSUP Weapon Systems Support (Mechanicsburg) posted a presolicitation for repair of 13 refrigeration compressors (NSN 7H-4130-015136359), delivered FOB Origin.
- AMMONIUM HYDROXIDE,NAVSUP Weapon Systems Support (Navy) plans to buy 2,739 PG of Ammonium Hydroxide (NSN 1HM 6810-01-018-9769 X2) made to a technical data package.
- 41- Vaneaxial Fans
- Sources Sought - Directional Hemispherical Reflectometer
- BEARING, BALL, DX