Solicitation
Shield, Heat, Aircraf
Department of Defense · Defense Logistics Agency
A newer version of this notice was posted Nov 16, 2026. It moves the due date from Nov 6, 2026 to Dec 16, 2026, which is the date shown on this page. See the latest version.
AI summary Beta
Summary of the version posted Oct 7, 2026. The notice was amended Nov 16, 2026. The due date moved from Nov 6, 2026 to Dec 16, 2026. Check what else changed on SAM.gov. The notice looks incomplete: Instructions to offerors and the evaluation factors in Sections L and M (about 107,000 characters in the middle of the solicitation were left out), including exactly how to submit the quote. Check the attachments on SAM.gov.
DLA Aviation at Oklahoma City is asking for quotes on 4 heat shields (NSN 2840-01-017-1900NZ, P/N 4045970), an aircraft engine part made of AMS 5510 heat-resistant steel that seals and protects the #5 bearing area. It is a critical safety item used in the F100 series turbine engine, and parts go to the DLA Distribution Depot at Tinker AFB, OK, with production items due on or before 31 Dec 2028. Only sources already approved by the Air Force can win, and a first article test is required unless you qualify for a waiver. Quotes are due 6 Nov 2026.
Who can bid (9)
- Must already be an approved source for this part when the award is made. The Government will not wait for pending source approval requests. From SPRTA127Q0004.pdf
- To get approved, a source submits a Source Approval Request to the AFSC Small Business Office at Tinker AFB. The qualification document asks for recent proof of making the same or a similar part, and for critical safety items the shipping documents must be within 3 years. From SPRTA127Q0004.pdf
- The source company profile must include a current DD Form 2345 (U.S. export-controlled data certification) or an export control license. From SPRTA127Q0004.pdf
Show all 9Show fewer
- Export-controlled drawings can only be viewed on SAM.gov by vendors authorized to view export-controlled data. From SPRTA127Q0004.pdf
- New manufacture only (no surplus or reseller stock), domestic origin under Buy American / Balance of Payments, with IUID marking and serial numbers. From SPRTA127Q0004.pdf
- AS9100 listed as the higher-level contract quality standard on each line item. From SPRTA127Q0004.pdf
- Active SAM.gov registration with an electronic business point of contact, and WAWF registration for invoicing. From SPRTA127Q0004.pdf
- Cybersecurity clauses apply: safeguarding covered defense information and a NIST SP 800-171 DoD assessment. From SPRTA127Q0004.pdf
- No set-aside. Open to businesses of any size. The NAICS code is 336412 with a 1,500 employee size standard. From SPRTA127Q0004.pdf
How to submit: Return the quote to the issuing office in Block 5A (DLA Weapons Support at Oklahoma City, 3001 Staff Drive, Tinker AFB). Buyer is Aric Harmon, aric.harmon.1@us.af.mil, (405) 737-7621. The exact submission method is in Section L, which was not in the text provided., due Nov 6, 2026, 2:00 PM EST (6 Nov 2026, 2:00 PM, UTC-5). What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (10)
- Serious: Must be an approved source before award. A new shop cannot just bid; the Air Force source approval process must be finished by award time, and the Government will not wait for it. From SPRTA127Q0004.pdf
- Serious: Critical safety item. The part is a critical safety item for a turbine engine, so quality, traceability and testing rules are strict. From SPRTA127Q0004.pdf
- Serious: Drawings are export-controlled. You can only view the Engineering Data List and drawings on SAM.gov if you are authorized for export-controlled data, so you may not be able to price the job without that access. From SPRTA127Q0004.pdf
Show all 10Show fewer
- Serious: First article test at your cost and risk. Unless waived, you must build 3 first articles (1 destroyed in testing) and anything you buy or build before approval is at your sole risk and cannot be billed under progress payments. From SPRTA127Q0004.pdf
- Worth checking: Key sections were not in the text provided. About 107,000 characters in the middle of the solicitation were left out, including the instructions to offerors and evaluation details, so some requirements may be missing from this brief.
- Worth checking: Attached data forms name a different part. The attached data list (DD 1423) and first article form (AFMC 260) refer to P/N 4054085-01, a metallic seal under another contract number, not this heat shield (P/N 4045970), so ask the buyer which forms apply. From SPRTA127Q0004.pdf
- Worth checking: First article report timeline conflicts. The clause table says the test report is due 120 days after the contract date, but the data list says 120 days after the Government approves the test plan, which changes your schedule risk. From SPRTA127Q0004.pdf
- Worth checking: Pick the right bid. You must choose Bid A (first article) or Bid B (waiver), and a wrong choice about your waiver eligibility could hurt your quote. From SPRTA127Q0004.pdf
- Minor: Quantity may change. The buy could be anywhere from 2 to 9 units, so you must price a range and your per-unit price has to work at any quantity. From SPRTA127Q0004.pdf
- Minor: Rated order. This is a priority-rated defense order, so you must accept and prioritize it under the Defense Priorities and Allocations System. From SPRTA127Q0004.pdf
Read from the notice and 1 attachment. Show which files.
- SPRTA127Q0004.pdf (read)
Full summary
What they want
- Make 4 new-manufacture heat shields to drawing 4045970 (AMS 5510 steel); quote price breaks for a quantity range of 2 to 9 each because the count may change
- Bid A (first article route): first article test plan, first article test report, 1 sample for destructive testing, 2 samples for non-destructive testing, then 4 production units (the 2 non-destructive samples count toward the 4 if approved)
- Bid B (no first article): 4 production units, only for firms that qualify for a first article waiver; do not quote both bids
- Serial number and unique item identification (IUID) marking on each unit, built under an AS9100 quality system
- Deliver production items to DLA Distribution Depot Oklahoma, Tinker AFB, by 31 Dec 2028; first article reports go to AFLCMC/LZPED at Tinker AFB
- Invoice and send inspection and acceptance reports through Wide Area Workflow (WAWF)
- Contract type
- Firm-fixed-price supply purchase (request for quotation under simplified acquisition terms); rated order (DO-A1)
- Period of performance
- One-time buy, no option years. Production items due on or before 31 Dec 2028. With first article (Bid A): test plan about 30 days after award, test report 120 days (documents disagree on the start date), Government approval within 45 days.
- Place of performance
- Tinker AFB, OK. Ship-to is DLA Distribution Depot Oklahoma; first article reports go to AFLCMC/LZPED at Tinker AFB. Inspection and acceptance are at origin (the contractor's plant).
- Estimated value
- Not stated
- How they'll choose
- Not fully stated in the text provided (Sections L and M were left out). Award goes only to an approved source. The Government may pick Bid A or Bid B, whichever is most advantageous, price and other factors considered.
- Offers due
- Nov 6, 2026, 2:00 PM EST (6 Nov 2026, 2:00 PM, UTC-5) (from the version posted Oct 7, 2026; amended since)
- How to submit
- Return the quote to the issuing office in Block 5A (DLA Weapons Support at Oklahoma City, 3001 Staff Drive, Tinker AFB). Buyer is Aric Harmon, aric.harmon.1@us.af.mil, (405) 737-7621. The exact submission method is in Section L, which was not in the text provided.
What they'll judge offers on
- Qualification: must be an approved source for this part before award (pass/fail)
- Price
- Other factors, not listed in the text provided (see Sections L and M)
- Delivery: offers that do not clearly meet the required delivery period are rejected as nonresponsive
What to include when you submit
- Quote either Bid A (CLINs 0001AA through 0001AE, first article required) or Bid B (CLIN 0001AF, first article waived). Do not quote both.
- Price every line item individually, or state a ZERO DOLLAR CHARGE.
- Give quantity price breaks across the range of 2 to 9 each; the Bid B quantity should match the current need of 4 each.
- Write your proposed delivery under each line item; offers that clearly miss the required delivery period are rejected.
- Hold prices firm for 120 days.
- Fill in the contractor fill-ins (F.O.B. address and inspection location) and the qualification information in clause 52.209-1.
- If you claim a first article waiver, quote only Bid B.
- Submit a Source Approval Request as early as possible if you are not yet an approved source.
Not in the notice text
- Instructions to offerors and the evaluation factors in Sections L and M (about 107,000 characters in the middle of the solicitation were left out), including exactly how to submit the quote
- The engineering drawing 4045970 and Engineering Data List, which are export-controlled
- The first article test requirements document LPF-QAR-003, which the solicitation says is attached but was not in the text
- Which attached forms actually apply to this part, since the attached data list and first article form name P/N 4054085-01
- The estimated contract value and any previous prices or incumbent
- How long source approval takes and which companies are already approved
- Contractor fill-ins such as the F.O.B. address and inspection location
More to check before you bid
- The AI summary also reads the notice as naming requirements:
- The AI summary's reading of the notice and its attachments says a bidder needs: DD 2345 export approval. The summary's list is under Who can bid; check it in the notice before you bid.
Notice details
Notice type, codes, versions and files
- Posted
- Oct 7, 2026
- Notice type
- Solicitation
- Office
- DLA Aviation at Oklahoma City, OK, Tinker AFB, OK
- Product/service code
- 2840 · Gas Turbines and Jet Engines, Aircraft, Prime Moving; and Components
- Business type
- Aircraft, ship & vehicle parts (FedReady's grouping, from NAICS 336412)
- Versions
3 versions have been posted, newest first.
- Nov 16, 2026 · Amendment 0002Due Dec 16, 2026 (changed)
- Oct 7, 2026 · Amendment 0001 (this version)Due Nov 6, 2026
- Oct 7, 2026 · SolicitationDue Nov 6, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- Support, Turbine NozDLA Aviation at Oklahoma City is asking for quotes on 5 EA of turbine nozzle support, NSN 2840-01-347-2206 PR, under solicitation SPRTA127Q0033.
- Overhaul of the UH-60 POWER TURBINE MODULEArmy Contracting Command-Redstone wants a contractor to overhaul and upgrade the Power Turbine Module of the T701D engine (used on UH-60/AH-64 helicopters) under a single-award,…
- NSN 2840014901337OK Case, Augmentor, Airc J85 PN 5125T85G01 FD20302401151Defense Logistics Agency (DLA) Aviation at Oklahoma City is buying an aircraft engine afterburner case (NSN 2840014901337OK, J85 engine, part number 5125T85G01) under…
- New Manufacture Material, NSN 2840016760196PR (AMC 3R)Solicitation SPRTA1-27-R-0062 is a letter solicitation sole sourced to GE Aviation (CAGE Code 07482), addressed to GE only, for turbine rotors (NSN 2840-01-676-0196PR) for the…
- New Manufactured Material, NSN: 2840-01-532-7658PR (AMC 3N)Solicitation SPRTA1-27-R-0075 from the Defense Logistics Agency (DLA) Aviation office at Oklahoma City is a letter solicitation sole sourced to GE Aviation for an accessory…