Solicitation
GOGA 336173 - Repair Conzelman Road
Department of the Interior · National Park Service · Sol. 140P2026R0106
AI summary Beta
Some details weren't available to this summary, so it may miss requirements. Check the attachments on SAM.gov.
The National Park Service (Denver Service Center) wants a contractor to repair Conzelman Road. The work is a new retaining wall on drilled concrete piles, a new grade beam carrying a steel bridge rail, new guardrails, and road replacement to match the existing road. The notice gives only "Conzelman Road" (a GOGA project) as the location. The estimated price is $1M to $5M, and the solicitation text says it is a HUBZone acquisition and currently unfunded.
Watch out for
- Set-aside conflict: SAM.gov says none, solicitation says HUBZone. The SAM.gov record shows no set-aside, but the solicitation says it is run through the HUBZone program, so a non-HUBZone firm may be ineligible.
This acquisition is being conducted via the Small Business Administration's HubZone program.
- Unfunded requirement. The Government may not award until money is available, so you could spend bid effort and bonding costs without an award.
This is currently an unfunded requirement with a high expectation that funds will be available.
- Bid bond and performance/payment bonds. A bid guarantee is due with the offer and bonding clauses are listed; small firms need surety capacity of this size before they bid.
Submit Standard Form 24, Bid Bond duly executed between the Offeror and the bonding
- Pre-proposal site visit. The solicitation points to Section L for a site visit; if it is mandatory, missing it could rule you out, and the details were not in the readable text.
for information regarding a pre-proposal site visit
- Heavy proposal with past performance and key personnel. Four non-price factors outweigh price, and past performance needs reference questionnaires returned by your clients before the deadline, so newer firms may struggle.
- Road closed, limited work hours, possible hazardous materials. The road closes during construction, work is generally Monday to Friday 8 a.m. to 5 p.m., and the specs include a hazardous materials abatement section, which can affect schedule and cost.
The road will be closed to the public during construction.
Read from the notice and 10 attachments. 2 not read in full.
- Sol_140P2026R0106.pdf
- B08_Attach_3_Midwest_Guardrail_Specifications.pdf
- B08_Attach_5_20230629-UG-CaliforniaST-75BridgeRail.pdf
- B08_Attach_8_Project_Experience.docx
- B08_Attach_11_Limitation_on_Sub.pdf
- B08_Attach_9_PastPerf_Vol_I.docx
- B08_Attach_10_Gen_Refs_Vol_II.pdf
- B08_Attach_2_GOGA_Conzelman_Road_Wall_-_Division_2_Through_49_Specifications_-_Final_CD_Submittal.pdf
- B08_Attach_7_WD_CA20260007_2_Sept_26.pdf
- B08_Attach_1_GOGA_Conzelman_Road_Wall_-_Division_1_Specs_-_Final_CD_Submittal.pdf
- B08_Attach_4_Drawings_GOGA_Conzelman_Road_Wall_-_Final_CD.pdf: too large
- B08_Attach_6_R1255074-Conzelman_Road_DD_Geotech_Report_-_signed.pdf: too large
Full brief
What they want
- Build a new retaining wall, supported by cast-in-place drilled concrete piles, to reduce erosion
- Build a new grade beam on top of the wall to carry a steel bridge rail
- Install new guardrails
- Replace the road surface to match the existing road
- Demolition, earthwork, grading, asphalt paving, pavement markings and landscape grading (per the listed spec sections)
- Place Government-furnished seed for vegetation on the scar side of the new wall
- Provide a construction schedule, key personnel (Project Manager and Quality Control Manager) and closeout documents
- Contract type
- Construction contract by negotiated request for proposals (RFP); the pricing type is not stated in the readable text
- Place of performance
- Conzelman Road, NPS "GOGA" project. No town or state is given in the notice, though the specs refer to California standards.
- Estimated value
- Between $1,000,000 and $5,000,000 (estimated price range of construction)
- How they'll choose
- Best value tradeoff (FAR Part 15). All non-price factors combined are significantly more important than price. The Contracting Officer is the source selection authority.
- Offers due
- 2026-10-29 at 2:00 PM (UTC-6, per the SAM.gov listing); the SF 1442 form shows 10/29/2026 and 1400 local time
- How to submit
- Not clearly readable. Volume II must be one electronic copy (no hard copies). The Section L paragraph with the submission address was cut from the text provided. The Contracting Officer is Shellie Murphy (NPS Denver Service Center).
What they'll judge offers on
- Factor 1 - Schedule (construction schedule and narrative)
- Factor 2 - Project Experience
- Factor 3 - Key Personnel Experience (Project Manager and Quality Control Manager)
- Factor 4 - Past Performance
- Price (fair and reasonable; checked for unbalanced line items)
What to include when you submit
- Volume I (technical) has four parts: schedule, project experience, key personnel resumes, and past performance
- Past performance: send the Past Performance Questionnaire (sections I and II) to your references, or submit a CPARS report instead
- Past performance: submit a narrative about any less-than-satisfactory past performance
- Volume II (business and price) includes the signed SF 1442 (blocks 14 to 20c), acknowledgment of amendments, Section B price schedule with a schedule of values for each line item, and the Section K representations and certifications
- Submit an SF 24 bid bond or other suitable bid guarantee
- Complete the General References form (surety, bank, insurance, subcontractors, suppliers)
- Complete the subcontracting percentage worksheet; large businesses must file a subcontracting plan
- A pre-proposal site visit is covered in Section L (details not in the readable text)
You must have
- HUBZone small business status. The solicitation says the acquisition is run through the SBA HUBZone program, and the HUBZone set-aside notice clause 52.219-3 is listed.
This acquisition is being conducted via the Small Business Administration's HubZone program.
- Limits on subcontracting (clause 52.219-14): a share of the work must be done by your own firm or similarly situated small subcontractors. The reporting form lists a maximum of 85% to non-similarly situated subs for general construction.
General construction. 85% maximum may be subcontracted to non-similary situated Subcontractors
- Active SAM.gov registration at the time you submit your offer
Your firm must maintain current, active registration
- Bid guarantee: an SF 24 bid bond or other suitable guarantee with the offer. Performance and payment bonds clause 52.228-15 is also listed, but the bond amounts are not readable.
Submit Standard Form 24, Bid Bond duly executed between the Offeror and the bonding
- Key personnel: a Project Manager and a Quality Control Manager, with resumes submitted with the proposal
Submit resumes for key personnel as identified in Section H of this solicitation and listed below.
- If the hazardous materials abatement section applies to your scope: state contractor's license (plus hazardous waste specialty license where applicable), MCS 90 endorsement, 40-hour OSHA training, and pollution liability insurance
Pollution Liability Insurance in the amount of $2,000,000 occurrence.
Not in the notice text
- Exact submission address or portal and the Section L proposal rules (that part of the solicitation was cut from the text provided)
- Page limits for the proposal volumes
- Period of performance: the days to start and finish are on the SF 1442 but are not clearly readable
- Whether the site visit is mandatory, and its date
- Contract pricing type, bond amounts and liquidated damages amount
- Full drawings and the geotechnical report (both were too large to be read)
- Wage determination details: a California wage determination file was attached but its text is not readable
- Whether SAM.gov's "no set-aside" or the solicitation's HUBZone statement is correct
- Whether the hazardous materials abatement section (022600) applies, since it is not in the specification table of contents
- Town, state and site address for Conzelman Road
FedReady checks notices like this against your business profile, tracks deadlines, and alerts you to new matches. Creating an account is free.
Key facts
- Response due
- Oct 29, 2026, 8:00 PM UTC
- Posted
- Sep 21, 2026
- Notice type
- Solicitation
- Solicitation
- 140P2026R0106
- Agency
- Department of the Interior · National Park Service
- Office
- DSC Contracting Services Division
- NAICS
- 237310
- Product/service code
- Z1LB
- Business type
- Construction & renovation
- Contracting contact
- Murphy, Shellieshellie_murphy@nps.gov7206102690
Full notice text from SAM.gov
Similar open opportunities
- RDO_TIOGA BRIDGE REHABILITATIONThe Bureau of Land Management (BLM), Roseburg District in Oregon wants a contractor to reseal and treat the timber parts of the Tioga Pedestrian Bridge over the North Umpqua River.
- ND OMAD 2025(1) Minuteman Missile AccessThe Federal Highway Administration's Central Federal Lands Division plans a small business set-aside road project in North Dakota (Minot area) to recondition about 50 miles of…
- St. Marks NWR Aucilla Tram Road Bridge DBThe U.S. Fish and Wildlife Service wants a small business to design and build changes to the Aucilla Tram Road Bridge and its water control structure at St.
- CO OMAD 300(71) Minuteman Missile AccessThe Federal Highway Administration (Central Federal Lands) plans to hire a small business to recondition up to 85.75 miles of gravel Minuteman Missile access roads and replace up…
- BRCA 310427 Southbound Shuttle StopThe National Park Service (Denver Service Center) wants a contractor to build shuttle stop improvements along Bryce Canyon Road at Bryce Canyon National Park, Utah, including a…