Solicitation
PMP END, CTFGL
Dept of Defense · Dept of the Navy · Sol. N0010426QTB81
Due in 14 days
AI summary Beta
NAVSUP Weapon Systems Support (Mechanicsburg) is asking for quotes to repair a pump end (PMP END, CTFGL), not to buy new ones. The Navy wants a 90-day repair turnaround and the award will be a bilateral contract (the contractor must sign). Quotes are due 2026-10-21.
Watch out for
- Late repair price reductions. You are docked a price amount per unit per month when you miss the repair turnaround, and the Government can also terminate for default.
Any asset for which the contractor does not meet the required RTAT will incur a price reduction per unit/per month the contractor is late
- Tight 90-day turnaround. The clock runs from receipt at your facility until Government acceptance, so inspection time counts against you.
The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract.
- Government source inspection and CAV reporting. You must report receipt in the CAV system on time and accommodate Government inspection, which adds administrative work.
the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt
- Option for added quantity. The Government plans to add an option quantity at the same unit price, so your price must hold if more units are ordered.
The Government intends to add an option quantity to the resultant contract.
Read from the notice text only.
Full brief
What they want
- Repair the PMP END, CTFGL (CAGE 83130 and 4BJ65, ref. NA1551-1-PMP END)
- Meet a Repair Turnaround Time (RTAT) of 90 days, counted from receipt of the asset at your facility
- Quote unit price, total price, RTAT, and price-to-buy-new for comparison
- Report all transactions in the Commercial Asset Visibility (CAV) system within five business days of receipt
- Support Government Source Inspection (GSI) and package to MIL-STD-2073
- Contract type
- Request for quote (RFQ) for repair; bilateral award; firm-fixed-price, estimated or not-to-exceed to be marked by the offeror
- Period of performance
- Repair turnaround of 90 days from receipt; an option for increased quantity of 365 days
- Offers due
- 2026-10-21 4:30 PM (UTC-04:00), per the response deadline field
What to include when you submit
- Quote unit price, total price and Repair Turnaround Time (RTAT)
- If not meeting the 90-day RTAT, state your capacity constraints
- Mark whether the price is firm-fixed, estimated or not-to-exceed, and give any RMA number
- Give a test and evaluation fee if the asset is beyond repair
- Give the new unit price and new unit lead time for comparison to repair price
- List the awardee CAGE, inspection and acceptance CAGE, and facility CAGE
- State the price reduction per unit per month for late repairs, and its maximum
- Verify nomenclature, part number and NSN before responding
You must have
- Cybersecurity Maturity Model Certification (CMMC) level notice applies
NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025)
- Small business subcontracting plan clause is included (applies to larger firms)
SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC
- Government Source Inspection is required
Government Source Inspection (GSI) is required.
Not in the notice text
- Quantity of units to repair
- How to submit the quote (email or portal)
- Place of performance
- How quotes will be evaluated
- Estimated value
- Which CMMC level applies
Is this a fit for your business?
Create a free accountFedReady checks notices like this against your business profile, tracks deadlines, and alerts you to new matches. Creating an account is free.
Key facts
- Response due
- Oct 21, 2026, 8:30 PM UTC
- Posted
- Sep 22, 2026
- Notice type
- Solicitation
- Solicitation
- N0010426QTB81
- Agency
- Dept of Defense · Dept of the Navy
- Office
- NAVSUP Weapon Systems Support Mech
- NAICS
- 333914
- Product/service code
- 4320
- Business type
- Manufactured parts & equipment
- Contracting contact
- Telephone: 7712290456ALISON.E.HARPER.CIV@US.NAVY.MIL
- Versions
- 3 (amended since first posted)
Full notice text from SAM.gov
CONTACT INFORMATION|4|N771.4|WG3|771-229-0456|ALISON.E.HARPER.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|COMBO INVOICE AND RECEIVING||TBD|N00104|TBD|TBD|SEE SCHEDULE|SEE SCHEDULE|SEE SCHEDULE||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS MECHANICSBURG| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|ALISON HARPER AT ALISON.E.HARPER.CIV@US.NAVY.MIL| EXERCISE OF OPTION TO FULFILL FOREIGN MILITARY SALES COMMITMENTS-BASIC(NOV 2014))|4||||| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1|| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(JUL 2026))|2||| OPTION FOR INCREASED QUANTITY (MAR 1989)|1|365 DAYS | CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEV 2026-O0015)(JUL 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|X|X|X|||X|X||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| Amendment to extend solicitation and update clauses. See continuation pages for details. This solicitation is issued pursuant to Emergency Acquisition Flexibilities (EAF). Accelerated and incremental delivery is encouraged and accepted before the delivery date(s) listed in the schedule. All freight is FOB Origin. This RFQ is for repair. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding. The Government is seeking a Repair Turnaround Time (RTAT) of: 90 Days Government Source Inspection (GSI) is required. Please note freight is handled by the Navy as per the Commercial Asset Visibility (CAV) Statement of Work. Your quote should include the following information: QUOTE AMOUNT AND RTAT o Unit Price:__________ o Total Price:__________ o Repair Turnaround Time (RTAT):_______ days If your company is not quoting the Government's Required Repair Turnaround Time (RTAT) or earlier, provide your company's capacity constraints? _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE) ____ Return Material Authorization # (RMA), if applicable:__________ TESTING AND EVALUATION IF BEYOND REPAIR T&E fee/price (if asset is determined BR/BER): AWARDEE INFO & PERFORMANCE LOCATION o Awardee CAGE: __________ Inspection & Acceptance CAGE, if not same as "awardee CAGE": __________ Facility/Subcontractor CAGE (where the asset should be shipped), if not same as "awardee CAGE":__________ IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW New unit price:__________ New unit delivery lead-time:__________ The Government intends to add an option quantity to the resultant contract. In reference to the option quantity, the Government may increase the quantity of supplies called for in the Schedule at the unit price specified. The Contracting Officer may exercise the option by written notice to the Contractor within the number of days in FAR 52.217-6 herein. Delivery of the added items shall continue at the same rate as the like items called for under the contract, unless the parties otherwise agree. IMPORTANT NOTE: Any asset for which the contractor does not meet the required RTAT will incur a price reduction per unit/per month the contractor is late - any delay determined to be excusable (e.g. Government Delay) will not result in a price reduction. If a price reduction is required due to unexcusable contractor delay, the Contracting Officer will implement the price reduction via a "reconciliation modification" at the end of the contract performance. Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's right to terminate for default. In reference to the above important note, the contractor provides the following price reduction amount per unit per month the contractor does not meet the RTAT: $__________, up to a maximum of: $_________. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the PMP END, CTFGL . 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The PMP END, CTFGL repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures. CAGE___Ref. No. ;83130 NA1551-1-PMP END 4BJ65 NA1551-1-PMP END (AUTH.DISTR. FOR 83130); 3.2 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 4. QUALITY ASSURANCE 4.1 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.2 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE
Similar open opportunities
- COMPRESSOR,REFRIGER, IN REPAIR/MODIFICATION OFNAVSUP Weapon Systems Support (Mechanicsburg) posted a presolicitation for repair of 13 refrigeration compressors (NSN 7H-4130-015136359), delivered FOB Origin.
- AMMONIUM HYDROXIDE,NAVSUP Weapon Systems Support (Navy) plans to buy 2,739 PG of Ammonium Hydroxide (NSN 1HM 6810-01-018-9769 X2) made to a technical data package.
- 41- Vaneaxial Fans
- Sources Sought - Directional Hemispherical Reflectometer
- BEARING, BALL, DX