Solicitation
VALVE,REGULATING,FL
Dept of Defense · Dept of the Navy · Sol. N0010426QTC49
Due in 22 days
AI summary Beta
The Navy (NAVSUP Weapon Systems Support, Mechanicsburg) wants a regulating valve repaired and is asking for quotes. It wants a repair turnaround time of 212 days, with Government inspection at the source. The award will be a bilateral agreement that needs the contractor's written acceptance, with an option to add quantity.
Watch out for
- Price cuts for late repairs. You propose a per-unit, per-month price reduction for missing the turnaround time, and the Government can also terminate for default.
will incur a price reduction per unit/per month the contractor is late
- Possible CMMC cybersecurity requirement. A CMMC notice clause is listed but the required level is not shown, and certification can take a small business months.
NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025)
- Long 212-day turnaround. Your quote must meet this repair time or explain capacity constraints, and missing it triggers the price reduction.
The Government is seeking a Repair Turnaround Time (RTAT) of: 212 Days
- Government source inspection. A Government inspector checks the work at your facility, so you must be set up to host them.
Government Source Inspection (GSI) is required.
Read from the notice text only.
Full brief
What they want
- Repair the regulating valve (CAGE 99643, ref. 58320-6 CDS58320-TAB)
- Meet the repair turnaround time (RTAT) of 212 days, or explain capacity constraints
- Allow Government Source Inspection (GSI)
- Quote unit price, total price, firm-fixed or estimated or not-to-exceed, and a testing fee if the valve is beyond repair
- Price the option quantity at the same unit price
- Report asset receipts in the Commercial Asset Visibility system within five business days
- Contract type
- Repair order awarded bilaterally; quote is marked firm-fixed price, estimated or not-to-exceed; includes an option for increased quantity
- Period of performance
- Repair turnaround time of 212 days from asset receipt to Government acceptance; option exercisable within 365 days after award execution
- Offers due
- 2026-10-26 4:30 PM Eastern (from the SAM.gov header)
- How to submit
- Not stated in the text; the contact listed is ALISON.E.HARPER.CIV@US.NAVY.MIL
What to include when you submit
- Verify nomenclature, part number and NSN before responding
- Quote unit price, total price and repair turnaround time
- If not meeting 212 days or earlier, explain your capacity constraints
- Check one: firm-fixed price, estimated, or not-to-exceed
- Give a testing and evaluation fee if the asset is beyond repair
- List awardee CAGE, inspection CAGE and facility CAGE
- Give a new-unit price and lead time for comparison
- State a price reduction per unit per month for late delivery, with a maximum
You must have
- Active SAM registration and a CAGE code (awardee CAGE is requested in the quote)
Awardee CAGE: __________
- Cybersecurity Maturity Model Certification (CMMC) notice clause is included; the level is not stated in the text
NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025)
- Government Source Inspection will be required
Government Source Inspection (GSI) is required.
Not in the notice text
- How award will be evaluated (no evaluation method is stated)
- How to submit the quote (method is not stated)
- Quantity to be repaired and size of the option quantity
- Which CMMC level applies
- Estimated contract value
Is this a fit for your business?
Create a free accountFedReady checks notices like this against your business profile, tracks deadlines, and alerts you to new matches. Creating an account is free.
Key facts
- Response due
- Oct 26, 2026, 8:30 PM UTC
- Posted
- Sep 25, 2026
- Notice type
- Solicitation
- Solicitation
- N0010426QTC49
- Agency
- Dept of Defense · Dept of the Navy
- Office
- NAVSUP Weapon Systems Support Mech
- NAICS
- 332919
- Product/service code
- 4820
- Business type
- Manufactured parts & equipment
- Contracting contact
- Telephone: 7712290456ALISON.E.HARPER.CIV@US.NAVY.MIL
Full notice text from SAM.gov
CONTACT INFORMATION|4|N771.4|WG3|771-229-0456|ALISON.E.HARPER.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|COMBO INVOICE AND RECEIVING||TBD|N00104|TBD|TBD|SEE SCHEDULE|SEE SCHEDULE|SEE SCHEDULE||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS MECHANICSBURG| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|ALISON HARPER AT ALISON.E.HARPER.CIV@US.NAVY.MIL| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1|| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(JUL 2026))|2||| OPTION FOR INCREASED QUANTITY (MAR 1989)|1|365 DAYS AFTER EXECUTION OF AWARD| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEV 2026-O0015)(JUL 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|X|X|X|||X|X||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| Accelerated and incremental delivery is encouraged and accepted before the delivery date(s) listed in the schedule. All freight is FOB Origin. This RFQ is for repair. The resultant award of this solicitation will be issued bilaterally, requiring the contractors written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding. The Government is seeking a Repair Turnaround Time (RTAT) of: 212 Days Government Source Inspection (GSI) is required. Please note freight is handled by the Navy as per the Commercial Asset Visibility (CAV) Statement of Work. Your quote should include the following information: QUOTE AMOUNT AND RTAT Unit Price:__________ Total Price:__________ Repair Turnaround Time (RTAT): _______ days If your company is not quoting the Government's Required Repair Turnaround Time (RTAT) or earlier, provide your company's capacity constraints? _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractors facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE) ___ TESTING AND EVALUATION IF BEYOND REPAIR T&E fee/price (if asset is determined BR/BER):__________ AWARDEE INFO & PERFORMANCE LOCATION Awardee CAGE: __________ Inspection & Acceptance CAGE, if not same as "awardee CAGE": __________ Facility/Subcontractor CAGE (where the asset should be shipped), if not same as "awardee CAGE":__________ IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW New unit price:__________ New unit delivery lead-time:__________ The Government intends to add an option quantity to the resultant contract. In reference to the option quantity, the Government may increase the quantity of supplies called for in the Schedule at the unit price specified. The Contracting Officer may exercise the option by written notice to the Contractor within the number of days in FAR 52.217-6. Delivery of the added items shall continue at the same rate as the like items called for under the contract, unless the parties otherwise agree. IMPORTANT NOTE: Any asset for which the contractor does not meet the required RTAT will incur a price reduction per unit/per month the contractor is late - any delay determined to be excusable (e.g. Government Delay) will not result in a price reduction. If a price reduction is required due to unexcusable contractor delay, the Contracting Officer will implement the price reduction via a "reconciliation modification" at the end of the contract performance. Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's right to terminate for default. In reference to the above important note, the contractor provides the following price reduction amount per unit per month the contractor does not meet the RTAT: $__________, up to a maximum of: $_________. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the VALVE,REGULATING,FL . 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The VALVE,REGULATING,FL repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures. CAGE___Ref. No. ;99643 58320-6 CDS58320-TAB; 3.2 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 4. QUALITY ASSURANCE 4.1 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.2 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE