Combined Synopsis/Solicitation
GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF
Department of Agriculture · Forest Service · Sol. 1240BH26R0013
Due in 2 daysSmall business
AI summary Beta
No AI summary for this notice yet.
Save it to generate your own AI brief in its bid workspace: a plain-English summary, the red flags, and how well your business fits.
Is this a fit for your business?
Create a free accountFedReady checks notices like this against your business profile, tracks deadlines, and alerts you to new matches. Free during early access.
Key facts
- Response due
- Sep 30, 2026, 9:00 PM UTC
- Posted
- Sep 17, 2026
- Notice type
- Combined Synopsis/Solicitation
- Solicitation
- 1240BH26R0013
- Agency
- Department of Agriculture · Forest Service
- Office
- USDA Forest Service
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 238990
- Product/service code
- Z2PZ
- Business type
- Construction & renovation
- Place of performance
- Fifty Six, AR, 72533
- Contracting contact
- James Edingtonjames.edington@usda.gov
- Versions
- 3 (amended since first posted)
Full notice text from SAM.gov
On September 17, 2026, amendment 0002 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following: 1. Post RFI questions and answers labeled C05a RFI QA 1240BH26R0013. 2. Post pre-bid sign in sheet labeled C05b Site Visit Sign In 1240BH26R0013. This amendment must be acknowledged and submitted with your proposal. *********************************************************************************************************************************************** On August 12, 2026, amendment 0001 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following: 1. Post Golder Specifications labeled “C04m Attachment 11 Golder 1240BH26R0013.” This SF30 must be acknowledged and submitted with your proposal. *********************************************************************************************************************************************** This project includes all labor, equipment, supplies, testing & inspections, and incidentals necessary for the Blanchard Springs Caverns (BSC) Dripstone and Discovery Trail Infrastructure repairs and safety upgrades. All work shall conform to the attached Drawings and Specifications. All work shall be performed by qualified and licensed contractors for all trades applicable. Work includes but is not limited to structural stabilization of tunnel entrance and exits, disposal and removal of existing supports, masonry repairs, Installation of Instrumentation & monitoring equipment, replacement of existing air lock doors at entrance and exits, replacement of existing security doors at entrance and exits, replacement of existing suspended ceiling system, components, and associated ductwork, replacement of existing bypass tunnel door, replacement of existing lighting and distribution system components, replacement of existing safety handrails, and replacement of the existing mine phone system and components.
Similar open opportunities
- Re-slurry and Re-stripe Bldg. 88 and 98 Parking LotsThe Department of Veterans Affairs (Network Contracting Office 21) plans to issue a Request for Quote to re-slurry and re-stripe the parking lots at Buildings 88 and 98 of the VA…
- COMMERCIAL MODULAR PLATFORM ALUMINUM RAMP INSTALLATION
- W. Kerr Scott Crane Rental
- RFI Notice: MGA Thomas Hall Security
- Skidmore Day Use Improvement, Prescott NF