Presolicitation
AZ BL COLO 7528(1) Burro Creek Road
Department of Transportation · Federal Highway Administration · Sol. 6982AF27B000002
Due in 2 daysSmall business
AI summary Beta
No AI summary for this notice yet.
Save it to generate your own AI brief in its bid workspace: a plain-English summary, the red flags, and how well your business fits.
Is this a fit for your business?
Create a free accountFedReady checks notices like this against your business profile, tracks deadlines, and alerts you to new matches. Free during early access.
Key facts
- Response due
- Sep 30, 2026, 8:00 PM UTC
- Posted
- Sep 15, 2026
- Notice type
- Presolicitation
- Solicitation
- 6982AF27B000002
- Agency
- Department of Transportation · Federal Highway Administration
- Office
- 6982AF Central Federal Lands Divisi
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 237310
- Product/service code
- Y1LB
- Business type
- Construction & renovation
- Place of performance
- Kingman, AZ, 86401
- Contracting contact
- Eric Grosskreuzcflcontracts@dot.gov
Full notice text from SAM.gov
THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE Small Business Set-Aside PROJECT NUMBER: AZ FLAP PIM FR510(1) PROJECT NAME: Burro Creek Road PROJECT DESCRIPTION: Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles. SCOPE OF THE WORK: The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items: Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats. Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project. Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project. The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement. PRINCIPAL WORK ITEMS: Roadway Aggregate: 1,600 TONS Ditch Reconditioning: 2,000 LNFT Full Depth Reclamation: 1.3 MILE Asphalt Concrete Pavement: 3,600 TON 18-Inch Pipe Culvert: 100 LNFT 24-Inch Pipe Culvert: 175 LNFT Boulder: 100 EACH ANTICIPATED SCHEDULE: Advertisement – October 2026 Award-January - 2027 Construction – January 2027 through October 2027 ESTIMATED COST RANGE: Between $2,000,000 and $5,000,000
Similar open opportunities
- Repair Taxiway Alpha & Bravo - North Auxiliary AirfieldThe 628th Contracting Squadron (Air Force) is seeking capability packages, for planning purposes only, from potential small business sources to repair Taxiways Alpha & Bravo at…
- Solicitation is Restricted to the Current Region 5 FERM BPA Holders - USDA Forest Service MNF Road Maintenance North
- ND NP THRO 204(1) Buck Hill Road
- New Fort Bliss Paving IDIQ Contract
- Solicitation is Restricted to the Current Region 5 FERM BPA Holders - USDA Forest Service Frazier Road Maintenance